River Chess Dredging 22.01.15
The Environment Agency oversaw the dredging and de-silting of the River Chess at Scotsbridge during January and February 2015. This 27 minute film shows the main activity between 22.01.15 and 04.02.15. The mill stream to the north was in need of clearing and de-silting, last february there was extensive flooding in Park Road caused by the overflowing river. See http://youtu.be/4f8BxbeTL4g
Видео River Chess Dredging 22.01.15 канала Les Mead
Видео River Chess Dredging 22.01.15 канала Les Mead
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Clearing Of The Small RiverLake Dredging Before And After Drone VideosMV "Cherry Sand" dredging the River Ayr.SNAKE POND FROM HELL! Mulching 2000 Feet Of Pond Bank With MTL XC5Schelluinen Baggeren 2011Busting A Beaver Dam! Mini Bobcat Excavator Mud Stuck Water CreekRemoving Even Bigger Beaver Dam Flooding StreetPond digging with excavator | TIME LAPSEUpgrading An Overflow On A Large PondPlaatsen van bentonietmatten op de bodem van het kanaal Bocholt-Herentals in PeltLong Reach Excavator DredgingUnderwater Gold Dredging in AK With Biggest Clean OutCaterpillar 365C Excavator Loading Trucks And Operator ViewChester Bowl Dam Removal and Stream RestorationDeadly Magnet Fishing Catch (Could Have Killed Someone)Part 2: Breaking up beaver dams with log loaderI Bought Myself A Newer Volvo!One More Day Of Dredging!Beaver Dam Removal with Excavator | Awesome Dredging CompilationGold Rush UK 2020 - The journey that a gold rush takes you on