Загрузка страницы

EcoGenerator: RAFAKO participation in the implementation of the Waste to Energy construction project

In the years 2013 - 2017, RAFAKO successfully participated in the implementation of the project "Construction of the Thermal Waste Treatment Plant for the Szczecin Metropolitan Area", being responsible for the design, delivery and assembly of the technological part, i.e. grate, recovery boiler, flue gas treatment plant and the technological wastewater treatment plant together with the system of the storage and distribution of post-process waste for two technological lines with a combustion efficiency of 10 Mg/h each and commissioning of the whole WtE plant. The project was successful and the launched EcoGenerator (the name of this WtE plant in Szczecin) has been burning MSW (municipal solid waste) from Szczecin and from the West Pomeranian area since the end of 2017. The WtE plant is able to accept 150,000 Mg of MSW per year. The RAFAKO technology used in the Szczecin investment allows EcoGenerator to achieve a lower level of harmful emissions than required by Polish law and EU standards. EcoGenerator is an important source of clean energy for the city of Szczecin. Its maximum cogeneration capacity is 32 MW of thermal energy and 11 MW of electricity. In a calendar year, EcoGenerator provides electricity and heat to approx. 30,000 households. Thanks to this investment, Szczecin has become a city of the sustainable development, and a significant stream of MSW generated in this city is no longer sent to the local landfills.

Видео EcoGenerator: RAFAKO participation in the implementation of the Waste to Energy construction project канала RAFAKO S.A.
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
4 октября 2019 г. 15:01:08
00:02:53
Яндекс.Метрика