Загрузка страницы

Moving 250,000 lbs of Connexes Metal Buildings Trackhoe Excavator 8wd Tractor

So a customer called me, and he had built a castle of connex buildings he was developing into a storage building complex. After hiring a crane to build the complex, he realized the complex was built 8 foot over the property line. After hiring 3 wreckers to try to move the monstrosity, unsuccessfully, his last resort was to cut the structure apart, unstack them, move them, and then restack them. He wanted to see if we thought we might could move them before he unstacked them, I assured him... we could, that we'd keep bringing equipment until they moved!

Видео Moving 250,000 lbs of Connexes Metal Buildings Trackhoe Excavator 8wd Tractor канала TeamGorilla18
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
2 марта 2019 г. 21:00:06
00:05:27
Яндекс.Метрика