Modified Lexington Load
Asheville Fire Department's Engine 9 has adopted a modified version of the "Lexington Load". This allows a rapid deployment of a 100 ft. bumper line. We added a 50 ft section to the driver's compartment in order to utilize this same line for foam operations.
Видео Modified Lexington Load канала Bradley Duncan
Видео Modified Lexington Load канала Bradley Duncan
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
GFD Training Minutes - Grapevine Load 1 3/4" Crosslay - ReloadMinuteman Hose DeploymentScorpion Load RackingCeres Fire Truck 4 Lexington Load DeploymentDeploying the bumper lineThe proper way to fold a high rise loadGFD Training Minutes - High Rise Pack - ReloadGFD Training Minutes - Skid Load - ReloadBumper Line Load3 Wide Modified MinutemanTwin Donut Bumper Load Deployment"Scorpion Load" Fire Hose Training THE O.G!Double Donut Bumper Load Training VideoGFD Training Minutes - Bumper Line - ReloadGFD Training Minutes - High Rise Pack - DeploymentAFD Quint 18 CompartmentsFlat Hose Load Deployment (preconnect / combination method / modified with a flip)Cleveland Load TrainingHose RollsHose Advancement Options - Engine 78