Which method is commonly used for cost estimation during early project phases
Wondering how professionals estimate project costs in the early stages of construction?
📌 The answer: Order of Magnitude Estimating (also called ROM Estimate).
It’s a quick, high-level method used before detailed project information is available.
✅ Ideal for feasibility studies
✅ Accuracy range: -25% to +75%
✅ Helps in early decision-making
This is one of the most common methods used when detailed designs or drawings are not yet ready.
🎯 Perfect for:
• Civil Engineers
• Project Managers
• Construction Students
• BIM Professionals
🔖 Hashtags & Keywords:
#CostEstimation #ConstructionPlanning #ProjectManagement #Shorts
Keywords: early cost estimation, order of magnitude estimate, construction budget planning, autodesk construction cloud tutorial
Видео Which method is commonly used for cost estimation during early project phases канала Ananta Shet
📌 The answer: Order of Magnitude Estimating (also called ROM Estimate).
It’s a quick, high-level method used before detailed project information is available.
✅ Ideal for feasibility studies
✅ Accuracy range: -25% to +75%
✅ Helps in early decision-making
This is one of the most common methods used when detailed designs or drawings are not yet ready.
🎯 Perfect for:
• Civil Engineers
• Project Managers
• Construction Students
• BIM Professionals
🔖 Hashtags & Keywords:
#CostEstimation #ConstructionPlanning #ProjectManagement #Shorts
Keywords: early cost estimation, order of magnitude estimate, construction budget planning, autodesk construction cloud tutorial
Видео Which method is commonly used for cost estimation during early project phases канала Ananta Shet
Комментарии отсутствуют
Информация о видео
2 июня 2025 г. 21:30:18
00:01:03
Другие видео канала