Загрузка страницы

Manitowoc MLC300 Crawler Crane Breakdown, Transport, Assemble

Our project in Ridgefield no longer needed our MLC300, so we broke it down and transported it 200 Miles North to its new project home in Kenmore. The Manitowoc isn't as complicated to breakdown and assemble as one might think. All the main structural components, like the crawlers and the base of the boom, go together with hydraulic pins. Included in the video is a time-lapse of the crawlers being installed. The crew had the help of a Manitowoc crane specialist to help with the process but our crew did all the heavy lifting and transporting. This was our first time disassembling the Manitowoc MLC and our second time assembling it. Kenworth Trucks with the heavy hauling power, Aspen, Wilson and Trail King Trailers with the heavy load strength.

0:00 - Intro
0:14 - Tip of Boom Loading
0:23 - Boom Loading
0:35 - Removing Tracks
0:41 - Crane House and Other Parts Arrival
0:52 - Crane House Unload
1:01 - Installing Tracks
1:28 - Counter Weight Install
1:35 - Base of Boom Install
1:44 - Boom Install
1:52 - Boom On, Laying Down
1:55 - Boom Going Up
2:01 - Boom Erect
+++SUBSCRIBE+++

Check us out on social media at facebook.com/ceccantiinc
And on Instagram @ceccanti_inc

Видео Manitowoc MLC300 Crawler Crane Breakdown, Transport, Assemble канала Ceccanti Inc
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
29 апреля 2020 г. 2:44:43
00:02:14
Яндекс.Метрика