Загрузка страницы

3 Common Installation Issues with James Hardie Siding

Owner, Clifton Muckenfuss, answers the question: What are some critical first steps that contractors miss when installing James Hardie siding?

1. Caulking above hose bibs, light blocks, etc. - THIS IS A NO-NO, and traps water behind the cladding!

2. Clearances - proper clearance for Hardieplank siding above blocks, doors, etc. 1/4" (some markets / geographic areas may be different, so check your local installation guidelines)

3. Pin-Backs / Touch Ups - pin back are used for aesthetic purposes only and designed to reduce bowing caused by irregular wall framing. Touch ups should be done using a James Hardie supplied touch up pen and in accordance with the manufacturer's specifications.

Learn more here: https://www.carolinaexteriorsplus.com/3-common-james-hardie-installation-mistakes/

Видео 3 Common Installation Issues with James Hardie Siding канала Carolina Exteriors
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
14 января 2021 г. 0:42:09
00:03:20
Яндекс.Метрика