Метро в Ереване Армения Yerevan metro 2018 エレバン地下鉄
Yerevan metro according to the explain by Wikipedia
Today the metro operates as a single line, with a separate shuttle service on Shengavit-Charbakh branch, and covers 13.4 kilometres (8.3 mi),[1] with trains running every five minutes from 6:30 a.m. till 11 p.m. It served about 60,000 passengers per day before a fare increase,[3] In 2012, 14.9 million passengers rode the metro.[4] but ridership fell by almost 20% to 50,000 passengers per day after the doubling of the fare.[5] The system employs about 1,200 workers. A peculiar feature of the metro is that the digital timers/clocks count up, i.e. they reset to "00:00" when a train departs, and keep counting up until the next train leaves. It is necessary for passengers to be aware that trains, in general, arrive/depart every 5 minutes or so.
Due to Yerevan's uneven landscape, the metro in some cases goes above ground. Of the ten stations; seven are underground of which one is a single-vault shallow level, and the rest are pylon deep-level stations. Continuing the tradition of all ex-Soviet underground systems, most of the stations are exquisitely decorated, often blending Armenian national motifs with late-Soviet architecture.
When the system opened it initially had no depot, and service bays in the reversal sidings were used to make minor repairs instead. The proper depot Charbakh was opened in 1985 as part of the second extension. In the early 1990s the metro system had a total of 70 cars (all of them 81-717/714 models) forming approximately 12 three-carriage trains. However, since then the intermediate carriages were sold to the Moscow and Saint-Petersburg systems in return for overhaul repairs on the driving cars (which Charbakh has no facility or apparatus to perform).
In 2000-2001, for economic reasons, all of the intermediate 81-714 carriages stopped operating and the system currently has only 13 81-717 two-carriage trains running, (12 on the main line, one on the shuttle service). The annual budget for Yerevan Metro in 2002 was 1 billion 440 million drams (about $2.5 million). Of this amount about 800 million drams was financed by the State. The rest of the budget was allocated from tickets costs, trade and advertisement. A ride on the Yerevan Metro currently costs 100 drams (about 25 cents).[3]
In 2012-2014 81-717 carriages were refurbished. After the refurbishment trains were given the same exterior and interior as the 81-71M trains in Prague.
Видео Метро в Ереване Армения Yerevan metro 2018 エレバン地下鉄 канала 東京太郎がんばっぺ太郎
Today the metro operates as a single line, with a separate shuttle service on Shengavit-Charbakh branch, and covers 13.4 kilometres (8.3 mi),[1] with trains running every five minutes from 6:30 a.m. till 11 p.m. It served about 60,000 passengers per day before a fare increase,[3] In 2012, 14.9 million passengers rode the metro.[4] but ridership fell by almost 20% to 50,000 passengers per day after the doubling of the fare.[5] The system employs about 1,200 workers. A peculiar feature of the metro is that the digital timers/clocks count up, i.e. they reset to "00:00" when a train departs, and keep counting up until the next train leaves. It is necessary for passengers to be aware that trains, in general, arrive/depart every 5 minutes or so.
Due to Yerevan's uneven landscape, the metro in some cases goes above ground. Of the ten stations; seven are underground of which one is a single-vault shallow level, and the rest are pylon deep-level stations. Continuing the tradition of all ex-Soviet underground systems, most of the stations are exquisitely decorated, often blending Armenian national motifs with late-Soviet architecture.
When the system opened it initially had no depot, and service bays in the reversal sidings were used to make minor repairs instead. The proper depot Charbakh was opened in 1985 as part of the second extension. In the early 1990s the metro system had a total of 70 cars (all of them 81-717/714 models) forming approximately 12 three-carriage trains. However, since then the intermediate carriages were sold to the Moscow and Saint-Petersburg systems in return for overhaul repairs on the driving cars (which Charbakh has no facility or apparatus to perform).
In 2000-2001, for economic reasons, all of the intermediate 81-714 carriages stopped operating and the system currently has only 13 81-717 two-carriage trains running, (12 on the main line, one on the shuttle service). The annual budget for Yerevan Metro in 2002 was 1 billion 440 million drams (about $2.5 million). Of this amount about 800 million drams was financed by the State. The rest of the budget was allocated from tickets costs, trade and advertisement. A ride on the Yerevan Metro currently costs 100 drams (about 25 cents).[3]
In 2012-2014 81-717 carriages were refurbished. After the refurbishment trains were given the same exterior and interior as the 81-71M trains in Prague.
Видео Метро в Ереване Армения Yerevan metro 2018 エレバン地下鉄 канала 東京太郎がんばっぺ太郎
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
![ՄԵՏՐՈ. Երևանի մետրոպոլիտենը 37 տարեկան է](https://i.ytimg.com/vi/-1uGrS9k-NE/default.jpg)
![81-717/714 metro trains [Метропоезда типа 81-717/714 – Номерные]](https://i.ytimg.com/vi/FlHrD8oO5gw/default.jpg)
![Yerevan, 21.07.17, Fr, Video-2, Metronerum, mi kich el dursy.](https://i.ytimg.com/vi/00YqzQmmTNs/default.jpg)
![მეტრო თბილისში - The Metro in Tbilisi, Georgia 2017](https://i.ytimg.com/vi/TQ5xuUQCCd4/default.jpg)
![Нижегородский метрополитен - The Metro in Nizhny Novgorod, Russia 2016](https://i.ytimg.com/vi/JdlS3ptszyg/default.jpg)
![Baku Metro](https://i.ytimg.com/vi/FblmKAra_cQ/default.jpg)
![Метро в Киеве: The Metro in Kiev, Ukraine 2017](https://i.ytimg.com/vi/y4N_haYMCbU/default.jpg)
![The Metro in Tbilisi, Georgia 2017 მეტრო თბილისში](https://i.ytimg.com/vi/0_cofz85CGM/default.jpg)
![Baku (Azerbaijan) Metro / Subway / U-Bahn - 09.1999](https://i.ytimg.com/vi/BmQAih16_94/default.jpg)
![Rail traffic in Romania - Snakes, tunnels, bridges - National Park Jiului [4K]](https://i.ytimg.com/vi/oIk1uO1cotc/default.jpg)
![Проект "Линии". Ереванский метрополитен | Project "LINES". Erevan metro](https://i.ytimg.com/vi/azLGJN31fNs/default.jpg)
![Метро в Ереване, Армения 2017 Երեւան քաղաքի մետրոպոլիտենի](https://i.ytimg.com/vi/u3ziavZBm1o/default.jpg)
![Парад метро в Subway simulator 3D](https://i.ytimg.com/vi/TEorYizp2Rs/default.jpg)
![Viedeň Metro/ Wien U-Bahn/ Vienna metro](https://i.ytimg.com/vi/7-KZiDDHGvo/default.jpg)
![Մետրո կամ Հաջորդ կայարանն է Երիտասարդական, հյուր՝ Դավիթ Նահապետյան](https://i.ytimg.com/vi/tf6sIf1WcwU/default.jpg)
![Bakı Metropoliteni-50 il: Xəttə ilk yubiley qatarı buraxılıb](https://i.ytimg.com/vi/G8cvXvpIGwI/default.jpg)
![Ереван 2002 А. Мещян "Баров манак"](https://i.ytimg.com/vi/rooyug5sYnM/default.jpg)
![Փողկապներով վարորդներ, չփախչող ուղևորներ. Երևանում նոր ավտոբուս է փորձարկվում](https://i.ytimg.com/vi/pS9PTfQSqu4/default.jpg)
![The Metro Manila Rail System 2018](https://i.ytimg.com/vi/JyheYpqwx1Q/default.jpg)
![Yerevan Metro in Armenia 2012!](https://i.ytimg.com/vi/xaXXd9l-5hE/default.jpg)