Загрузка страницы

Footings concrete forms on bedrock terrain

Thwere was not much on the internet showing footings on rocky terrain, so here`s a walk-around of our footings forms ready for concrete pour. These footings are on built on sandstone and conglomerate rock and incorporate several steps to accommodate a grade change of approximately 8 feet. They are made with a combination of 2x8 (and 2x6, 2x4) and shiplap. Tied internally with metal strapping ties from lumber yard. Walls on top will be Faswall wall forms (insulated concrete forms made from recycled ground-up hardwood pallets mixed with 15% portland cement cast into blocks) (See www.faswall.com).
Vertical rebar spacing its at 12" centres to line up with cores in Faswall blocks. Engineered with lots of #4 rebar (1/2") and some #5, (5/8") for a potential large seismic event in the Pacific Northwest.

Видео Footings concrete forms on bedrock terrain канала M-D Aston
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
14 апреля 2012 г. 10:02:10
00:05:53
Яндекс.Метрика