Загрузка страницы

The COMMAND CENTER of the MINE RUDNIK NORILSK(НОРИЛЬСК) (ADVANCED TECHNOLOGY)

Join this channel to get access to perks:
https://www.youtube.com/channel/UCmDGb4KRHrKkpFASMpSQuAg/join

🅵🅰🅲🅴🅱🅾🅾🅺 GROUP https://www.facebook.com/groups/3469619139795263

The Oktyabrsky mine, located in the Norilsk industrial region, develops rich cuprous and disseminated copper-nickel ores in the western flank of the Oktyabrsky deposit, which is one of the two main deposits of sulfide copper-nickel ores of the Talnakh ore cluster.

The mine was commissioned in nine stages. The first stage was put into operation on March 31, 1974, the last - on December 31, 1985. Since 1987, the mine has been operating at design volumes of ore extraction. From 1987 to 2011, more than 150 million tons of ore were mined here. On average, 15 thousand tons of ore is mined here daily, which includes copper, nickel and platinoids.

In 2011, a new ore transfer complex and a local underground crushing complex were commissioned at the mine. In 2013, the construction of a new ore transfer was completed.

The Oktyabrsky mine, together with another mine of the Oktyabrsky deposit, the Taimyrsky mine, is the largest non-ferrous metal mining enterprise in Russia.
🅵🅰🅲🅴🅱🅾🅾🅺 :
https://www.facebook.com/eneandreiru/

🅸🅽🆂🆃🅰🅶🆁🅰🅼 :
https://www.instagram.com/arteneru/

Видео The COMMAND CENTER of the MINE RUDNIK NORILSK(НОРИЛЬСК) (ADVANCED TECHNOLOGY) канала ART ENE
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
5 февраля 2021 г. 20:30:34
00:08:02
Яндекс.Метрика