Загрузка страницы

Repairs Continue on Ship 20’s Heat Shield | SpaceX Boca Chica

As SpaceX continues to prepare for Ship 20’s test campaign, crews are still repairing its heat shield. Meanwhile, work on the Chopsticks also continues.

Video & Photos from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by DK (@DKlarations)

All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.

Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.

Rolling Updates and Discussion: https://forum.nasaspaceflight.com/index.php?board=72.0

Articles: https://www.nasaspaceflight.com/?s=Starship

NSF Store: https://shop.nasaspaceflight.com/

L2 Boca Chica (more clips and photos) from BC's very early days to today.
https://forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/)
0:00 - Sunset at Boca Chica
0:23 - Starhopper Watches Over SpaceX's Boca Chica Launch Site
0:46 - Work on Orbital Launch Mount
1:40 - Crews Work on Ship 20's Thermal Protection System
2:31 - Sunrise over Boca Chica
2:59 - Barrel Section with Unusual Reinforcement
3:25 - New Structure / Possibly for Chopsticks or QD Arm Extension
3:51 - Barrel Sections Outside the Wind Break
4:12 - Booster Aft Dome / This is possibly for Booster 5
4:43 - 8th GSE Forward Dome Being Sleeved / Ground Support Equipment (GSE) tanks hold consumables for testing and launch
6:00 - Work Continues on the QD Arm Extension
6:23 - Booster 4 in High Bay
6:48 - Final Cryo Shell Tank is Unhooked and Ready for Transport
7:13 - Crews Work on New Structure / This is possibly a raptor engine installation platform
8:00 - LTM 1350-6.1 Crane Packed Up for Return
8:49 - Remedios Ave Work Area / Including SN15 and SN16 Standing By
9:13 - Construction for New High Bay Continues
10:26 - GSE Tank 8 Stacking in the Mid-Bay
10:53 - Nosecone in Production Tent 3 with an Aerocover / Usually the flap is installed first, so this may be a test
11:24 - Crews Work on the Quick Disconnect Arm
11:49 - Work on Ship 20's Thermal Protection System Continues
12:37 - Crews Preparing Ship 20 for it's Upcoming Cryo Tests
12:55 - Work on Chopsticks Continues / These will be used to stack and catch the vehicles

Видео Repairs Continue on Ship 20’s Heat Shield | SpaceX Boca Chica канала NASASpaceflight
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
3 сентября 2021 г. 7:40:37
00:13:42
Яндекс.Метрика