Load bearing structure for refinery. Shoring contracting by Prorentus.
Shoring contracting works were carried out to support and lift a duct pipe in order to release the pipe supports.
Client required installation of shoring structure to support and lift a 150 ton duct pipe at 16 meter height while reinforcement for the existing support structure is installed.
Advantages:
1. Fast and professional assembly.
2. Tailor-made design.
3. All assembly and safety installations are provided by UAB Prorentus.
4. All scaffolding assembly, bearing capacity and lifting of the duct is UAB Prorentus responsibility.
5. During exploitation of the shoring structures, workers had an easy and safe access to support structures to carry out installation works.
Видео Load bearing structure for refinery. Shoring contracting by Prorentus. канала Prorentus UAB
Client required installation of shoring structure to support and lift a 150 ton duct pipe at 16 meter height while reinforcement for the existing support structure is installed.
Advantages:
1. Fast and professional assembly.
2. Tailor-made design.
3. All assembly and safety installations are provided by UAB Prorentus.
4. All scaffolding assembly, bearing capacity and lifting of the duct is UAB Prorentus responsibility.
5. During exploitation of the shoring structures, workers had an easy and safe access to support structures to carry out installation works.
Видео Load bearing structure for refinery. Shoring contracting by Prorentus. канала Prorentus UAB
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
![Prorentus Ltd. shoring contracting for salt factory construction](https://i.ytimg.com/vi/PoJrMOaJOH4/default.jpg)
![Prorentus scaffolding design for shoring contracting](https://i.ytimg.com/vi/YaYj6aa8lhE/default.jpg)
![Prorentus Ltd. Construction of the Dome with Layher TG-60](https://i.ytimg.com/vi/bp-sbh5C3dU/default.jpg)
![Temporary bridge installation for new pedestrian bridge over the river](https://i.ytimg.com/vi/33gdNuGpKMU/default.jpg)
![Viaduct renovation by Prorentus Ltd.](https://i.ytimg.com/vi/e2pxOtplLeQ/default.jpg)
![Prorentus scaffolding engineering services for Globalita at PET plant Klaipeda FEZ](https://i.ytimg.com/vi/6YN6tuXqoLw/default.jpg)
![Prorentus shoring contracting at CHP. Temporary working platform for installation of roof trusses](https://i.ytimg.com/vi/usee_y0Rcpw/default.jpg)
![Shoring bridge between two buildings](https://i.ytimg.com/vi/MtUX906vJ0M/default.jpg)
![Wooden trusses with MITEK nail plates](https://i.ytimg.com/vi/qoltOS6Pgak/default.jpg)
![Prorentus shoring solution for extension of the building using Layher FW](https://i.ytimg.com/vi/JGtT1QBm9_s/default.jpg)
![PRORENTUS SIM (Scaffolding Information Modeling)](https://i.ytimg.com/vi/TE3rSvCLO0k/default.jpg)
![Rail bridge shoring contracting](https://i.ytimg.com/vi/fWBmaN-Po4s/default.jpg)
![SmartRock2™ The Most Advanced Concrete Temperature and Maturity Sensor](https://i.ytimg.com/vi/u_H_yIxjUe0/default.jpg)
![Mobile scaffold for spherical ammonia tank by Prorentus Ltd.](https://i.ytimg.com/vi/OyhqZ3iJcgg/default.jpg)
![Residential building in Konstitucijos pr. by Prorentus with Layher TG 60 shoring](https://i.ytimg.com/vi/iXWnbBfXuNk/default.jpg)
![Prorentus & Layher Baltic at Resta2017 exhibition](https://i.ytimg.com/vi/snQehQhNUVc/default.jpg)
![WORK OR STUDY? BOTH. STORY OF SUCCESS](https://i.ytimg.com/vi/YnkvULbOKqY/default.jpg)
![Prorentus using Giatec technology for saving time and risk managment in shoring contracting](https://i.ytimg.com/vi/bne3Yv9puWw/default.jpg)
![2015 09 25 Konferencija "Pasiruošimas Rail Baltic 2 projekto įgyvendinimui"](https://i.ytimg.com/vi/L15CCtieDJc/default.jpg)
![Prorentus Ltd. shoring contracting with Layher TG-60 at SCHMITZ CARGOBULL factory](https://i.ytimg.com/vi/iCC31DglnaM/default.jpg)
![Road bridge shoring contracting](https://i.ytimg.com/vi/1Xav3ivbFP8/default.jpg)