Project 101 - St. Jacques bridge Overpass
The ministère des Transports, de la Mobilité durable et de l’Électrification des transports (MTMDET) specified a new method to install the bridge across a two lane highway interchange, reconnecting east and west St. Jacques Street.
In order to limit the obstacles to the road network and limit traffic disturbances, MTMDET required the deck of the Saint-Jacques Bridge to be built on a bank on the side of the highway and then launched across the highway.
Mammoet and Demathieu Bard–Aecon created an innovative approach which adapted their existing method of skidding to fulfil MTMDET’s requirements for the installation method. Tune in 3/9 at 8 a.m. CST!
For more information about Mammoet, visit https://www.mammoet.com
#skiddingsystem #bridgeconstruction #mammoet
Видео Project 101 - St. Jacques bridge Overpass канала Mammoet
In order to limit the obstacles to the road network and limit traffic disturbances, MTMDET required the deck of the Saint-Jacques Bridge to be built on a bank on the side of the highway and then launched across the highway.
Mammoet and Demathieu Bard–Aecon created an innovative approach which adapted their existing method of skidding to fulfil MTMDET’s requirements for the installation method. Tune in 3/9 at 8 a.m. CST!
For more information about Mammoet, visit https://www.mammoet.com
#skiddingsystem #bridgeconstruction #mammoet
Видео Project 101 - St. Jacques bridge Overpass канала Mammoet
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Project S-Oil - Saving time with the Mammoet PTC200774,000 lb Transformer Superload - Beyel Brothers Crane & RiggingPernis-Mammoet executes decommissioning project at petrochemical plantBulo Bulo- It takes the right key to unlock the fastest routeMammoet - Weighed weights on wheels - Map Ta Phut, Thailand and Haugesund, Norway (2006)Introducing Mammoet's PTC 210 DS200 years of crushing it: Mammoet completes unique move of rock crusher in CaliforniaSC&RA Job of the Year Award video - 'Raising TBM Bertha'Mammoet load out Aasta Hansteen Living QuartersTHE 'UNO' SALVAGEMammoet - Mega load out of BP Clair TopsideLR13000 reactor installation - Standing tall to streamline liftsWhat's it's like to operate a $13 million Mammoet heavy craneMammoet - A major overhaul - Moerdijk and Botlek, The Netherlands (2006)Unique engineering feat concluded as Chernobyl arch has reached resting placePTC 200 DS lifts 1,600 ton wash towerWorld's Biggest And Most Epic Transport Operations You Will Love To SeeHow to perform big lifts with small impact with the Mammoet FOCUS30Swift action keeps FPSO installation on track