Chrysler’s Space Shuttle Proposal: the SSTO SERV and MURP
Chrysler Aerospace was already contracted for the Saturn 1 and 1B First Stage so in 1971
they proposed an alternate shuttle program, the SERV and MURP
SERV: the Single-stage Earth-orbital Reusable Vehicle had a 53 metric ton payload in a 7m x 18m payload bay
12 LH2/LOX aerospike engines were arranged around the rim of the base, covered by movable metal shields
Jet Engines, which were fired just prior to touchdown in order to slow the descent
MURP, the Manned Upper-stage Reusable Payload
The MURP was based on the HL-10 lifting body (Six Million Dollar Man test Vehicle) and a Larger Versionone larger (the D-34) could carry up to ten passengers
Видео Chrysler’s Space Shuttle Proposal: the SSTO SERV and MURP канала Hazegrayart
they proposed an alternate shuttle program, the SERV and MURP
SERV: the Single-stage Earth-orbital Reusable Vehicle had a 53 metric ton payload in a 7m x 18m payload bay
12 LH2/LOX aerospike engines were arranged around the rim of the base, covered by movable metal shields
Jet Engines, which were fired just prior to touchdown in order to slow the descent
MURP, the Manned Upper-stage Reusable Payload
The MURP was based on the HL-10 lifting body (Six Million Dollar Man test Vehicle) and a Larger Versionone larger (the D-34) could carry up to ten passengers
Видео Chrysler’s Space Shuttle Proposal: the SSTO SERV and MURP канала Hazegrayart
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Lockheed's LS-200 Star Clipper Spaceplane a Space Shuttle alternativeProject Super Orion Nuclear Pulse Propulsion Interstellar ArkAltas V - NASA Boeing Starliner OFT- 2 Mission | Full Recap (Launch to Docking)Why Single Stage to Orbit rockets SUCK. The wacky history and future maybes of SSTOsVenturestar Spaceplane SSTO Maiden Flight "Space Shuttle Replacement ?"Beyond Trinity - Proxima Centauri Colonizing Mission in KSPThe MAKS Spaceplane: Multipurpose aerospace system (Russian: МАКС)If Rockets were TransparentJapan's Space Tourism Single Stage to Orbit(SSTO) Reusable Rocket. The Kankoh-maru (観光丸, Kankōmaru)Boeing's 4 Million lbs Payload Rocket (LMLV) Large Multipurpose Launch Vehicle ConceptSpaceX Starship timeline ft. Elon's tweetsRocket StagingKSP - How to build a Sea DragonSpaceX DM-2 Flight Day Highlights - May 30, 202010 Advanced Spacecraft for Space Exploration and Space TourismProject Andoria - Crewed Mission to Pluto Part 1. | KSP RSS/RO/ROKerbalismWars In SFS be like...Roton Rotary Rocket SSTO with Helicopter LandingNuclear Starship - Earth to Mars in 3 months and ready for use by SpaceX in less than ten years?