DAM CUTOFF WALL - SEEPAGE BARRIER CONSTRUCTION - PLASTIC DIAPHRAGM WALL
3D METHOD STATEMENT OF A DAM CUTOFF / PLASTIC DIAPHRAGM WALL / CEMENT BENTONITE / SEEPAGE BARRIER CONSTRUCTION
The video shows the construction of a cutoff wall to remediate or prevent seepage of water from happening under a dam or reservoir. The seepage over time can cause the foundation of the dam to weaken, potentially leading to the collapse of the dam itself. The construction of the wall is accomplished with the construction of a cement bentonite (also called CB or coulis) plastic diaphragm wall. This is undertaken with the usage of modern equipment that can dig through both soils and rocks. Wall thicknesses can vary from 80cm up to 1.5m. The wall can reach depths of up to 250m.
For more information please contact ray.farley@brasfondusa.com or +1 (330) 262 0015.
www.brasfond.com
Видео DAM CUTOFF WALL - SEEPAGE BARRIER CONSTRUCTION - PLASTIC DIAPHRAGM WALL канала Brasfond
The video shows the construction of a cutoff wall to remediate or prevent seepage of water from happening under a dam or reservoir. The seepage over time can cause the foundation of the dam to weaken, potentially leading to the collapse of the dam itself. The construction of the wall is accomplished with the construction of a cement bentonite (also called CB or coulis) plastic diaphragm wall. This is undertaken with the usage of modern equipment that can dig through both soils and rocks. Wall thicknesses can vary from 80cm up to 1.5m. The wall can reach depths of up to 250m.
For more information please contact ray.farley@brasfondusa.com or +1 (330) 262 0015.
www.brasfond.com
Видео DAM CUTOFF WALL - SEEPAGE BARRIER CONSTRUCTION - PLASTIC DIAPHRAGM WALL канала Brasfond
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
NSCC Diaphragm Wall CutterDiaphragm Wall ConstructionBACHY SOLETANCHEPERFORACION DE PILOTES CON #BAUERBG30DAM CUTOFF WALL - SEEPAGE BARRIER CONSTRUCTION - PLASTIC SECANT PILE WALLBAUER Spezialtiefbau GmbH – Dammertüchtigung am SylvensteinspeicherBAUER Group – Diaphragm Wall Method: Cut-off WallPIPELINE CONSTRUCTION SYSTEMPCA - Cement Grouting ProcessHydromill Module SH 50 Diaphragm/Slurry walls Soilmec [150m & 250 mt deep]Muro milán 400 mm de espesor en Ciudad de México, disponible en venta ó renta en Veracruz (México)DIAPHRAGM WALL CONSTRUCTION (Part-1)│कंस्ट्रक्शन इंजीनियरिंग का नया तकनीक│Execution on siteDiaphragm WallLiebherr - Slurry wall cutter LSC 8-18HOBAS Jacking Process (Animation)Diaphragm Wall - Perth (long version)Bauer BG System - Kelly SystemSubsea Chain CleanerBodemBouw Cutter Soilmix promofilm Parklaan, VeghelBridge construction - Incremental Launching - 3D Animation