Загрузка страницы

Spring Refit #3 Sole boards down in the main living area now all be it temporarily

Sole boards down in the main living area now all be it temporarily. So I'm at the stage now where i can trial fit the sole boards, in the living area they seem very good so i think i will fix them in place then cut the shower room sole and under tug deck sole read to install soon.
Hope you enjoyed the video,
Please Like Comment Share and Subscribe.
Please consider clicking one of the links below and supporting my channel.
Yours
Steve T
Please consider supporting this channel.
https://www.patreon.com/NarrowboatJet
https://www.paypal.me/Defender130
https://www.amazon.co.uk/hz/wishlist/ls/3DIXC07YEAVA5?ref_=wl_share

Видео Spring Refit #3 Sole boards down in the main living area now all be it temporarily канала Narrowboat Precious Jet
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
20 марта 2021 г. 17:20:00
00:16:08
Другие видео канала
Spring Refit #4 Time to pay attention to the bulkheads!!Spring Refit #4 Time to pay attention to the bulkheads!!Spring Refit #2 Still insulating the bilge ready for the big sole fitting!!!Spring Refit #2 Still insulating the bilge ready for the big sole fitting!!!Winter Update 21. Floor is fully painted now and the ballast in going back in!Winter Update 21. Floor is fully painted now and the ballast in going back in!Winter Update #12, In this vlog we continue to remove more of the sole ready for paintingWinter Update #12, In this vlog we continue to remove more of the sole ready for paintingWalking The River Sowe part 2, in this part we finally make it to the source in BedworthWalking The River Sowe part 2, in this part we finally make it to the source in BedworthWinter Update #19  All the rust is now removed from the bilge!! Only need to two pack the restWinter Update #19 All the rust is now removed from the bilge!! Only need to two pack the restFitting CEILING PANELS in a narrowboat on my own - the EASIEST way I could! Boating On A BudgetFitting CEILING PANELS in a narrowboat on my own - the EASIEST way I could! Boating On A BudgetSpring Refit #1 Its time to start putting stuff back into the boat!!!Spring Refit #1 Its time to start putting stuff back into the boat!!!Winter Update #22 Sole board deliveryWinter Update #22 Sole board delivery125. Removing the narrowboat engine so I can de-rust and paint the bilge125. Removing the narrowboat engine so I can de-rust and paint the bilgeWinter Update #17 Getting ballast down and other ballast moved to allow more bilge to be exposed!Winter Update #17 Getting ballast down and other ballast moved to allow more bilge to be exposed!Winter Update #14 Getting very close to finishing the rip out now, Refit is getting closerWinter Update #14 Getting very close to finishing the rip out now, Refit is getting closerWinter Update #20 Final part of the bilge has now been painted!!Winter Update #20 Final part of the bilge has now been painted!!Winter Update #16 In this vlog we paint with two pack epoxy resin in the bilgeWinter Update #16 In this vlog we paint with two pack epoxy resin in the bilgeNo 34 - The Locks at AtherstoneNo 34 - The Locks at AtherstoneWinter Update #18 Last part of the bilge has now been cleared of rust and rust proofed.Winter Update #18 Last part of the bilge has now been cleared of rust and rust proofed.WINTER UPDATE #13, We finally get under the Tug Deck cleared out ready for painting!WINTER UPDATE #13, We finally get under the Tug Deck cleared out ready for painting!River Sherbourne, In this video we walk the length of the river Sherbourne from source to confluenceRiver Sherbourne, In this video we walk the length of the river Sherbourne from source to confluenceTunnel Light. Rewire and clean of a 1929 Frances search lightTunnel Light. Rewire and clean of a 1929 Frances search lightFOR SALE - CaparinaFOR SALE - Caparina
Яндекс.Метрика