Загрузка страницы

Crude oil tankers Loading Operation

Loading operations Crude /Product
LOADING OPERATION ON TANKERS

GENERAL CHECKLIST

· Loading plan will be prepared by Chief Officer and discussed with all concerned including Duty Officer during pre-arrival meeting.

· Duty Officer will ensure he understands the plan thoroughly.

· Duty Officer will confirm with Chief Officer that pre-arrival checks as per company procedures have been carried out satisfactorily.

PRIOR COMMENCEMENT OF LOADING CHECKLIST

· Duty Officer will ensure that checks as per company specific “pre-cargo operations checklist” have been complied with.

· Duty Officer will confirm all designated duty hands are at their stations.

· Duty Officer will double check that valves have been lined as per cargo plan.

· Duty Officer will ensure that all “Anti-Pollution” gears and measures are in place.

· Duty Officer will attend hose connection operation.

· Duty Officer will double check that access means for shore personnel is in compliance with rules/regulations.

COMMENCEMENT OF LOADING

· Duty Officer will ensure initial flow to be minimum and preferable by gravity.

· All pipelines must be checked to confirm no leakages.

· Duty Officer will ensure cargo is received in nominated tanks.

DURING LOADING OPERATION CHECKLIST

· Duty Officer will ensure that checks as per company specific “during cargo operations checklist” have been complied with.

· Duty Officer will ensure that all “Anti-Pollution” gears and measures remain in place.

· Duty Officer will take regular rounds.

· Duty Officer will attend to topping off and ballast/de-ballast operations under instructions of Chief Officer.

· Duty Officer will regularly check ullages/quantities of tanks

· Duty Officer will inform Chief Officer whenever he reaches a critical stage.

· Duty Officer will monitor drafts as per instructions from Chief Officer.

COMPLETION OF LOADING

· Duty Officer will reduce rates well in time.

· Duty Officer will keep watch on topped off tanks.

· Duty Officer will attend hose disconnection operation.

· Duty Officer will ensure that all valves have been shut on completion of loading operations.

DISCHARGING OPERATION ON TANKERS

Видео Crude oil tankers Loading Operation канала Skilled Sailor
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
22 июля 2021 г. 12:41:14
00:03:48
Яндекс.Метрика