- Популярные видео
- Авто
- Видео-блоги
- ДТП, аварии
- Для маленьких
- Еда, напитки
- Животные
- Закон и право
- Знаменитости
- Игры
- Искусство
- Комедии
- Красота, мода
- Кулинария, рецепты
- Люди
- Мото
- Музыка
- Мультфильмы
- Наука, технологии
- Новости
- Образование
- Политика
- Праздники
- Приколы
- Природа
- Происшествия
- Путешествия
- Развлечения
- Ржач
- Семья
- Сериалы
- Спорт
- Стиль жизни
- ТВ передачи
- Танцы
- Технологии
- Товары
- Ужасы
- Фильмы
- Шоу-бизнес
- Юмор
Walton on Trent A new 150m-long, three-span bridge North of HS2 Streethay 1 st April 2026
Construction is underway on a new 150m-long, three-span bridge and 1.5km bypass at Walton-on-Trent, near the former Drakelow Power Station, designed to replace the70-year-old single-track Bailey bridge. The project, which began in early 2025 with major construction proceeding through 2025, is expected to open in autumn 2026, aiming to ease traffic congestion.
Key Details of the New Bridge and Bypass:
Location: The new bridge crosses the River Trent, linking to a new 1.5km bypass road to improve traffic flow in the area.
Structure: The project includes a 150m-long, three-span bridge, with construction involving pile driving on both the Walton and Staffordshire sides.
Timeline: Work began in early 2025. A local councillor indicated in late 2025 that the project is on track for completion in autumn 2026.
Old Bridge Future: The existing, narrow Bailey bridge is planned to be converted into a pedestrian and cycle crossing once the new bridge is functional.
Cost and Development: The project is part of a larger £50 million infrastructure investment (including land costs) linked to the redevelopment of the former Drakelow Power Station.
Progress: As of late 2025, piling work was well underway with the pier construction for the new bridge.
This project has been long-awaited to resolve significant traffic bottlenecks caused by the restrictive, one-way, weight-limited bridge currently in use.
Filmed with A DJI Mavic 4 pro
Music: https://www.bensound.com/free-music-for-videos
Artist: Benjamin Tissot
License code: 35WYZJJTAL3XV1MW
A content creater using You Tube
Видео Walton on Trent A new 150m-long, three-span bridge North of HS2 Streethay 1 st April 2026 канала Paul C G Burrows
Key Details of the New Bridge and Bypass:
Location: The new bridge crosses the River Trent, linking to a new 1.5km bypass road to improve traffic flow in the area.
Structure: The project includes a 150m-long, three-span bridge, with construction involving pile driving on both the Walton and Staffordshire sides.
Timeline: Work began in early 2025. A local councillor indicated in late 2025 that the project is on track for completion in autumn 2026.
Old Bridge Future: The existing, narrow Bailey bridge is planned to be converted into a pedestrian and cycle crossing once the new bridge is functional.
Cost and Development: The project is part of a larger £50 million infrastructure investment (including land costs) linked to the redevelopment of the former Drakelow Power Station.
Progress: As of late 2025, piling work was well underway with the pier construction for the new bridge.
This project has been long-awaited to resolve significant traffic bottlenecks caused by the restrictive, one-way, weight-limited bridge currently in use.
Filmed with A DJI Mavic 4 pro
Music: https://www.bensound.com/free-music-for-videos
Artist: Benjamin Tissot
License code: 35WYZJJTAL3XV1MW
A content creater using You Tube
Видео Walton on Trent A new 150m-long, three-span bridge North of HS2 Streethay 1 st April 2026 канала Paul C G Burrows
Комментарии отсутствуют
Информация о видео
2 апреля 2026 г. 0:05:03
00:09:35
Другие видео канала




















