Загрузка страницы

TRAINING | PERI MAXIMO forming foundations (EN)

In the foundation area, the centrally-positioned tie point also has the advantage that there are no complications when installing ties with water bars. In the top area, the tension and compression brace is set to match the appropriate dimension and thus holds the formwork securely in position.
Block foundations are formed with the foundation strap up to a height of 100cm and a maximum panel length of 240cm.

Visit our YouTube channel:
https://www.youtube.com/c/Perigroup

Corporate Website:
https://www.peri.com

Facebook:
https://www.facebook.com/PERI

LinkedIn:
https://www.linkedin.com/company/peri

Instagram:
https://www.instagram.com/pericorporate

Twitter:
https://twitter.com/PERIgroup

The user shall always observe the currently valid Assembly and Use Instructions of the PERI products used by him/her:
https://www.peri.com/en/terms-of-use.html

Видео TRAINING | PERI MAXIMO forming foundations (EN) канала PERI Group
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
29 января 2020 г. 12:21:39
00:01:15
Яндекс.Метрика