North-South Corridor (Kvesheti-Kobi) Road Project in Georgia
The solution designed in the Detailed Engineering phase for the section Kvesheti-Kobi reduces the length of this route from 35 km to 22 km, and the travel time from one hour to approximately 20 minutes, improving road safety conditions during operation. To achieve this, the future road will include several viaducts and tunnels, including an arch bridge, 432 m in length and with a span of 285 m over Khada valley. At the highest point of the route (3,300 m), a 9-km tunnel will be built using a 15 m in diameter tunnel boring machine (TBM).
Видео North-South Corridor (Kvesheti-Kobi) Road Project in Georgia канала IDOM Consulting, Engineering, Architecture
Видео North-South Corridor (Kvesheti-Kobi) Road Project in Georgia канала IDOM Consulting, Engineering, Architecture
Показать
Комментарии отсутствуют
Информация о видео
14 января 2019 г. 15:10:56
00:02:11
Другие видео канала
IDOM SOCIALIDOM Metals&Mineral Services#IDOMWomen: Yolanda Cerezo#IDOMWomen: Beatriz Olalla#IDOMWomen: Ana DíazIDOM 2023IDOM Christmas Carol 2022: Carol of the BellsSan AtilanoIDOM MadridPiscina Colegio VizcayaVisita de Emmanuel Macron al nuevo polideportivo en Tarbes diseñado por IDOMIDOM Long Span Roofs - Cable Structures - Membrane StructuresJornada Práctica CAR-CYL - Resumen de la JornadaAncient Egypt Lighting the Land of the Pharaohs IDOMEstadio Monumental. Club Atlético River PlatePresentación CIBER Escala CPI & GMV - Compra Pública Precomercial y CiberseguridadPresentación CIBER Escala CPI & Universidad de Murcia - Compra Pública Precomercial y CiberseguridadJornada Práctica CAR-CYL - PIC's Escala CPIBodega Beronia OllauriJornada de Lanzamiento CPM CAR-CYL Escala CPI – 19 de noviembre a las 13.00hJornada Escala CPI – 29 de septiembre a las 11.30h