Загрузка страницы

PROJECT UPDATE TOUR! LRT 2 & SUMULONG HIGHWAY! SIGHTSEEING TOUR 2020!

The Manila Light Rail Transit System Line 2, also known as MRT Line 2, LRT Line 2, MRT-2, LRT-2, or Megatren, is a rapid transit line in Metro Manila in the Philippines, generally running in an east-west direction along the Radial Road 6 and a portion of the Circumferential Road 1.

Although the line is operated by the Light Rail Transit Authority, resulting in it being called as "LRT-2", it is actually a heavy rail, rapid transit system owing to its use of electric multiple units instead of the light rail vehicles used in earlier lines and is presently the only line utilizing such vehicles in the country until the opening of Line 7 in 2020 and Line 9 (Metro Manila Subway) in 2025.

Envisioned in the 1970s as part of the Metropolitan Manila Strategic Mass Rail Transit Development Plan, the eleven-station, 16.75-kilometer (10.41 mi) line was the third rapid transit line to be built in Metro Manila when it started operations in 2003. It is operated by the Light Rail Transit Authority (LRTA), a government-owned and controlled corporation attached to the Department of Transportation (DOTr) under an official development assistance scheme.

Serving close to 200,000 passengers daily, the line is the least busy among Metro Manila's three rapid transit lines, and was built with standards such as barrier-free access and the use of magnetic card tickets to facilitate passenger access in mind. Total ridership however is significantly below[clarification needed] the line's built maximum capacity, with various solutions being proposed or implemented to increase ridership in addition to the planned extensions to the line. However, the short-term solutions have had a minimal[clarification needed] effect on ridership, and experts have insisted that the extensions be built immediately, despite pronouncements that the system is steadily increasing ridership each year. Regardless, the line encounters periods of peak ridership during rush hour in the morning and the evening.

The line is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses and jeepneys, to and from a station to reach their intended destination. Although the line aimed to reduce traffic congestion and travel times along R-6 and portions of C-1, the transportation system has only been partially successful due to the rising number of motor vehicles and rapid urbanization. Expanding the network's revenue line to accommodate more passengers is set on tackling this problem.

For more details about RAILWAY PROJECT;
go here https://en.wikipedia.org/wiki/LRT_Line_2_(Metro_Manila)

RELATED VIDEOS;
MARIKINA VLOG https://www.youtube.com/watch?v=HeJko7r8Ay0
MARIKINA HEIGHTS https://www.youtube.com/watch?v=dirX-5nCO8U
SKYWAY STAGE 3 PROJECT
https://www.youtube.com/watch?v=xpINsphRGEg
MRT-LINE 7 PROJECT LATEST UPDATE
https://www.youtube.com/watch?v=MF8ZjW47xoo
NLEX-HARBOR LINK LATEST UPDATE
https://www.youtube.com/watch?v=3oiPf3gaPxI

Thanks for watching! I hope you enjoyed today's video. If you're new SUBSCRIBE to keep updated.

For more videos go here http://bit.ly/dadakoo

Facebook page https://www.facebook.com/moreactionvideo/?modal=admin_todo_tour

Thank You! See you again on my next vlog :D

Vlogging equipment;

Samsung Galaxy Mobile Phone S10
Gimbal Stabilizer (Osmo Mobile 2)

Видео PROJECT UPDATE TOUR! LRT 2 & SUMULONG HIGHWAY! SIGHTSEEING TOUR 2020! канала Dada Koo
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
16 августа 2020 г. 3:10:40
00:48:25
Яндекс.Метрика