Handover assurance for the Elizabeth Line
A critical stage of the Crossrail project is the extensive handover and assurance activity for each of the 30 stations, shafts, portals and railway systems which must be completed before the Elizabeth line can open.
Видео Handover assurance for the Elizabeth Line канала Crossrail Project
Видео Handover assurance for the Elizabeth Line канала Crossrail Project
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
![The First #PurpleTrain From Reading](https://i.ytimg.com/vi/SXV95PR7pEc/default.jpg)
![Railway Progress: Whitechapel (December 2020)](https://i.ytimg.com/vi/wxDt8OrJsXg/default.jpg)
![Secrets of the Elizabeth Line](https://i.ytimg.com/vi/bt0jvNXDVZw/default.jpg)
![How The Elizabeth Line Trains Use Formula 1 Technology To Be More Sustainable | How Do They Do It?](https://i.ytimg.com/vi/K5GQ2ohrUd8/default.jpg)
![](https://i.ytimg.com/vi/Coyem67X4qM/default.jpg)
![Farringdon Station Open Day](https://i.ytimg.com/vi/lI6Bh2HKrPw/default.jpg)
![Inside London's New £15 Billion Subway Line](https://i.ytimg.com/vi/5RnuIiaLxCs/default.jpg)
![The Lost Main Line to London: Rediscovering the Bedford to Hitchin Line](https://i.ytimg.com/vi/1BrFsHuimE8/default.jpg)
![The Bank Capacity Upgrade Works](https://i.ytimg.com/vi/0eVRc2Sy_yU/default.jpg)
![Why Crossrail is running so late - BBC London](https://i.ytimg.com/vi/E1z0AI9_8IM/default.jpg)
![Abbey Wood to Westbourne Park (Normal speed) (December 2020)](https://i.ytimg.com/vi/r1HZHDTjGSw/default.jpg)
![The New West Ealing / Acton Main Line Stations](https://i.ytimg.com/vi/M7h1VXi48ak/default.jpg)
![Railway Progress: Liverpool Street Elizabeth line station (July 2021)](https://i.ytimg.com/vi/QsJKRd15sJY/default.jpg)
![Crossrail: The Next Important Milestone](https://i.ytimg.com/vi/tiV1XrGTNDY/default.jpg)
![Heathrow to Upminster for just £1.50](https://i.ytimg.com/vi/twtw5Xi4Neg/default.jpg)
![Railway Progress: Tottenham Court Road (February 2021)](https://i.ytimg.com/vi/8e9zpa-QrZo/default.jpg)
![Signalling Software and Systems Integration (August 2020)](https://i.ytimg.com/vi/rtE0nlOrwGQ/default.jpg)
![Inside London’s £18BN New Railway](https://i.ytimg.com/vi/swSeHxk9TGI/default.jpg)
![Crossrail design line: stations, art and public space on the Elizabeth line](https://i.ytimg.com/vi/VeitUQsA1Fs/default.jpg)
![Secrets of the Central Line](https://i.ytimg.com/vi/ouC0uF7_Geg/default.jpg)