Загрузка страницы

(S08 EP10) Freeway Flyer VII: Las Vegas Mainlines

This is an extended compilation ride along the various freeways in the Las Vegas Metropolitan Region. It is split into five different phases.

Phase I: U.S. 95 North from I-15 to past C.C. 215.
Phase II: U.S. 95 South from C.C. 215 to NV 613, plus a part of NV 613 West.
Phase III: NV 613 East to U.S. 95 South to I-15 South to I-215 East to McCarran International Airport Terminal 3 Departures.
Phase IV: McCarran Terminal 3 to I-215 West to I-15 North to C.C. 215 West, plus a part of C.C. 215 West in the Northeast.
Phase V: C.C. 215 East in the Northeast to I-15 South, to past the Spaghetti Bowl and Project Neon.

Technical Specifications:
Video Camera: Sony HDR-CX675
Still Camera: Nikon L850
Tripod: Rocketfish RF-TRP47C (14.5-47.0 inch)
Vehicle: 2003 Honda Civic
Video Editing Software: Apple Final Cut Pro X

Laptop Specs (R08MBP):
MacBook Pro (Retina, 13-inch Late 2012)
2.5 GHz dual-core Intel i5
8GB 1600 MHz DDR3L
256GB flash storage
Intel HD Graphics 4000
macOS Catalina
Lacie Rugged Thunderbolt 1 Portable SSD 500 GB (LAC9000491)

Видео (S08 EP10) Freeway Flyer VII: Las Vegas Mainlines канала rockersk08
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
20 декабря 2019 г. 13:15:01
00:25:17
Яндекс.Метрика