Russia Murmansk - Arctic LNG2 Project - BAUER BG36 with oscillator BV2000

Secant Pile - Kesişen Kazık - Буронабивная свая
Arctic LNG 2 is another LNG production-related project of NOVATEK
The project includes the construction of three LNG trains, with a capacity of 6.6 mtpa of LNG each, and at least 1.6 mtpa of stable gas condensate. The total LNG capacity of the three trains will be 19.8 mtpa. The project employs an innovative construction concept using gravity-based structures (GBS). OOO Arctic LNG 2 is the operator and owner of all the assets.

The Utrenneye field is the resource base for Arctic LNG 2. The field is located in the Gydan Peninsula in YNAO approximately 70 km across the Ob Bay from Yamal LNG.

In 2018, we completed the front-end engineering design (FEED) and started site preparation, construction of early phase power supply facilities, production wells drilling, and construction of the quayside.

The participants of Arctic LNG 2 approved a final investment decision (FID) for the project in September 2019. Capital expenditures to launch the project at full capacity is estimated at $21.3 billion equivalent.

The GBS design concept as well as extensive localization of equipment and materials manufacturing in Russia will allow to considerably decrease the CAPEX per ton of LNG produced under this project. This will ensure a low cost structure of products and maximum competitiveness across the LNG markets.

Видео Russia Murmansk - Arctic LNG2 Project - BAUER BG36 with oscillator BV2000 канала TEMELTAS CONSTRUCTION - ТЕМЕЛТАШСТРОЙ
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
25 августа 2020 г. 19:46:31
00:02:52
Яндекс.Метрика