Загрузка страницы

Pipeline: Carrying in a Creek Section

One of those rare moments when I'm not part of the action. Due to the narrow right-of-way, this section was carried out and back in after the ditch was dug. The downhill grade (in the video) was roughly 32%, while the two lead hoe-operators are used to this sort of thing, the guy in the rear isn't so it was slow going. My father was running the lead hoe, and my old swamper is running the second hoe, luckily enough the third hoe-hand is pretty decent operator, just not a pipeliner. Apologies for rotating the camera, it didn't instantly dawn on me that it wouldn't work like that, lol.

Видео Pipeline: Carrying in a Creek Section канала ReadOrDieDW
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
27 ноября 2014 г. 23:23:20
00:08:23
Яндекс.Метрика