New Johnson St. Bridge - heavy lifts final day
The massive Dynamic Beast crane barge's final day in Victoria Harbour is here. The main task today is to attach "Panel D", a large steel insert that sits between the rings and span. The Dynamic Beast crane barge installed the deck span yesterday and crews bolted it to the rings last night.
Видео New Johnson St. Bridge - heavy lifts final day канала Gary Hoyer
Видео New Johnson St. Bridge - heavy lifts final day канала Gary Hoyer
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Sony RX10 IV 4K - Old Johnson St Bridge Leaves VictoriaPromontory hardhat tour 3Old Johnson St. Bridge removal - The barge leaves the Harbour (archived 1080p stream)BC Day Fireworks 2015New Johnson St. Bridge - heavy lifts day 1Hudson Walk Tower Crane Setup Pt 1Victoria BC's old Johnson St. Bridge removal - Day 1 (RAW live stream)Old Johnson St. Bridge removal - Final pieces day 1 (archived 1080p stream)Victoria Harbour - NT 12000 Barge Tow OutHMCS Saskatoon being towed out of Victoria HarbourSony RX10 IV 4K - Dockside Green Grass Fire - Aug 9 2020New Johnson St. Bridge - deck span placement liftCDI Crane Removal via BargePromontory Table Flying 02Sony RX10 IV 4K test clip #2Hudson Walk Tower Crane Setup Pt 2JSB - Span 1 Main Deck PourJanion first concrete pile pourPromontory Bucket PourJSB Timber Pile Driver SetupUFO