Загрузка страницы

Trainz TRS19 - yard switching - a longer video

Trainz TRS19. Best watched full screen / 1080p.

"Chuck, Joe. Dispatcher here.
Spot those two tank cars in the Fuel Depot.
Then finish making up the consist in the main yard by adding the box cars standing at the Freight Depot.
The Mallet will then take over.
Dispatcher out."

NYC 0-8-0 switcher - Ben Neal, freeware.
Mallet - anl/jacksonbarno, freeware.

The heavy switcher has some interesting features. Note, for example, that the locomotive engineer rotates to face the direction of travel. And the panting of the air compressor to refill the air reservoir after brake applications.

The whole process takes about 15 minutes, even in such a small yard with a minimum amount of movements. In real life it would take considerably longer.

Видео Trainz TRS19 - yard switching - a longer video канала philskene
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
19 сентября 2018 г. 9:44:10
00:14:52
Яндекс.Метрика