ITER Assembly Animation
F4E, managing Europe’s contribution to ITER, is responsible for providing half of the machine’s components.
In this video drawn directly from ITER CAD data, you can follow their installation in the Tokamak pit, the “home” of the device.
The first two pieces – the base and lower cylinder of the cryostat—are already in place.
See what comes next as the 23 000-tonne device is built from bottom to top.
Видео ITER Assembly Animation канала FUSION FOR ENERGY
In this video drawn directly from ITER CAD data, you can follow their installation in the Tokamak pit, the “home” of the device.
The first two pieces – the base and lower cylinder of the cryostat—are already in place.
See what comes next as the 23 000-tonne device is built from bottom to top.
Видео ITER Assembly Animation канала FUSION FOR ENERGY
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
How is Europe manufacturing the ITER Toroidal Field coils?ITER - the world's largest puzzle (2020 version)ITER : FIRST RING-SHAPED COIL PRODUCED ON SITE IS POSITIONED IN THE ASSEMBLY PITITER - Getting closer everydayInside the ITER Vacuum Vessel factorytokamak náhled 4ITER: The $65BN Power Plant of the FutureITER plasma-facing components tested in high heat fluxITER: THE MOST POWERFUL MAGNET IN THE WORLDITER : Make your own Tokamak!How close is nuclear fusion power?ITER: Assembly of world's largest nuclear fusion reactor begins | DW NewsITER NOW 1.8: Preparing for the Big Lift (Dispatch du Confinement)ITER site - October 2021Can This $22 Billion Megaproject Make Nuclear Fusion Power A Reality?ITER NOW 1.7: The Divertor SectionThe ITER Vacuum Vessel - Where the Fusion Reaction UnfoldsЧеловечество начало строить термоядерный реактор. ITER сдвинулся с мёртвой точкиThe ITER You Never SeeITER NOW 1.3: Visiting ITER