Scratch Bash Project: Westinghouse Transformer Factory- Part Four

This video covers the assembly of the High Bay- the main transformer assembly building. Out of this building the completed transformers- power, smaller distribution, and mobile units, are shipped.

Assembly was very similar to the previous video (Part 3) covering the "back building" so I tried not to repeat information. I did add some interior details at the large door end, as you can see into the building a little bit. I also added a simulated crane that is slightly visible through the large windows. The interior is lighted and there are several external lights as well.

Same as on Part 3- this was shot hand held, so be forewarned!

With the completion of the High Bay the major construction of the factory is complete. I will post one other video- Part 5- that will cover the rabbit holes I got myself into. These are the roof walk out, water tower and Westinghouse building sign. Look for that video very soon.

And the final video- Part 6- will cover the installation of the factory buildings on the layout.

Thanks for watching!

Видео Scratch Bash Project: Westinghouse Transformer Factory- Part Four канала The Bennett Model Railroad
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
17 апреля 2021 г. 19:46:37
00:27:19
Яндекс.Метрика