2" Fowler Showman's Traction Engine
In this video I have put the other studs in the castings for the 1st and 2nd shafts and put most of the bolts through the castings and horn plates, and I've started work on the rear wheels by drilling and countersink the steel bands that go around the outside of the rims, later the rubber tyres will be stuck to these, I'm afraid it's not much of a video, as I didn't think people needed to see the drilling
Видео 2" Fowler Showman's Traction Engine канала julian mowlam
Видео 2" Fowler Showman's Traction Engine канала julian mowlam
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
2" Fowler Showman's Traction EngineGluing The Neck Into The Body And Priming The Back Faces2" Fowler Showman's Traction Engine2" Fowler Showman's Traction Engine2" Fowler Showman's Traction Engine2" Fowler Showman's Traction Engine2" Fowler Showman's Traction Engine2" Fowler Showman's Traction Engine2" Fowler Showmans Traction engineSanding Up The Body And Neck Ready For The FretsFirst Project On The CNC Machine2" Fowler Showmans Traction Engine final drive gearThe Final Machining Of The Neck Of A Gibson Les Paul Style Guitar2" Fowler Showman's Traction Engine2" Fowler Showman's Traction Engine continuing the cylinder top casting and steam chest2" Fowler Showman's Traction Engine second half of the differential gear2" Fowler Showman's Traction EngineA small bracket to hold a motor controller for a quadcopterThis is the start of my long term project2" Fowler Showman's Traction Engine drilling the steam exhaust holes