Description for Koysha Hydropower (Ethiopia)
Koysha (2’160 MW, under construction) is the fourth hydropower plant of Omo/Gibe river cascade in Ethiopia, comprising Gilgel Gibe (200 MW), Gibe II (420 MW) and Gibe III (1’870 MW), all currently in operation.

Koysha is a step forward in the development of the entire hydropower potential of the Omo river and represents a realization of the large-scale vision started more than 25 years ago with the design of Gilgel Gibe hydroelectric power plant. It testifies our long-term commitment for the progress of Ethiopia’s energy sector.

The project includes several outstanding examples of value engineering and design optimization, carried out by SP throughout the entire design and construction period of the hydroelectric power plant.

The layout includes an RCC gravity dam, approximately 180 m high, that creates a large reservoir of about 6’500 Mm3.

Floods are discharged by means of a gated spillway located on a saddle at the left side of the RCC dam: a large channel with a flip bucket designed for releasing a flow of about 13’100 m3/s in a plunge pool adjacent to the river, downstream of the powerhouse.

The dam is crossed by three steel penstocks feeding an open-air powerhouse, one of the intakes is lowered to allow early generation using the first two units during the first impounding.

The project includes two 6 m diameter middle level outlets embedded in the dam body allowing to control the reservoir level during the first impounding, release artificial/ecological flows and lowering the reservoir level for inspection/maintenance needs.

The river diversion layout includes two concrete culverts on the right side of the river, aimed to divert the river during the dam construction and designed to discharge up to 3’000 m3/s, and an upstream composite RCC/rockfill cofferdam.

Both the river diversion layout and the energy-generation operating rules of Koysha have been optimized taking advantage of the large flow regulation capacity of the upstream Gibe III project.

Tandem operations of the two projects allow to maximize energy generation and provide great flexibility guaranteeing power supply during both dry season and peak-demand period.

The power house is located on the left side of the river, housing eight Francis turbines generating 2’160 MW, together with erection bays and control building. Step-up transformers are located behind the powerhouse. Each unit is connected to three single-phase 400 kV transformers, for a total of 24 transformers that are linked through overhead lines to the 400kV Switchyard.
Thanks

Видео ሌላኛው ብርቁ ኃብታችን ኮይሻ! канала Ethio Green Time
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
31 октября 2020 г. 17:16:17
00:05:41
Другие видео канала
Genale Dawa documentryGenale Dawa documentryAmazing Technology Hydropower Plant And Largest Modern Generator Production ProcessAmazing Technology Hydropower Plant And Largest Modern Generator Production Processበጣና በለስ ስኳር ልማት ፕሮጀክት ለባለድርሻ አካላትና ለብዙሃን መገናኛ ጋዜጠኞች ከጥር 15 16, 2012 ዓ ም ድረስ የተዘጋጀ የጉብኝት መርሃ ግብርበጣና በለስ ስኳር ልማት ፕሮጀክት ለባለድርሻ አካላትና ለብዙሃን መገናኛ ጋዜጠኞች ከጥር 15 16, 2012 ዓ ም ድረስ የተዘጋጀ የጉብኝት መርሃ ግብርBalakot Hydropower Project | Technical Details and Updates | Kaghan ValleyBalakot Hydropower Project | Technical Details and Updates | Kaghan ValleyHydropower in Africa - Switch On: The SeriesHydropower in Africa - Switch On: The SeriesSalini Impregilo Koysha Hydroelectric Project (2016 - ongoing)Salini Impregilo Koysha Hydroelectric Project (2016 - ongoing)Ethiopia : Koysha Seta Documentary | ኮይሻ ሴታ  የተዘነጋው አንጋፋ ጥበበኛ ዘጋቢ ፊልምEthiopia : Koysha Seta Documentary | ኮይሻ ሴታ የተዘነጋው አንጋፋ ጥበበኛ ዘጋቢ ፊልምWenchi project| ወንጪ ፕሮጀክት Ethiopian grand projectWenchi project| ወንጪ ፕሮጀክት Ethiopian grand projectBeles River first descent (Ethiopia kayaking)Beles River first descent (Ethiopia kayaking)Gibe III spillway, Opening of 4 gates, October 2020Gibe III spillway, Opening of 4 gates, October 2020The Colorado River: Balancing Water Needs for the WestThe Colorado River: Balancing Water Needs for the WestSiuri Hydropower Project (5MW).Siuri Hydropower Project (5MW).wakanda in tana...Great project or devils mission /'ዋካንዳን በጣና' ታላቅ ፕሮጀክት ወይስ ሰይጣናዊ ተልዕኮ?wakanda in tana...Great project or devils mission /'ዋካንዳን በጣና' ታላቅ ፕሮጀክት ወይስ ሰይጣናዊ ተልዕኮ?500 Watt Hydro Power System in Virginia (Overview)500 Watt Hydro Power System in Virginia (Overview)Ethiopia: Lowland irrigated wheat research and production achievements (EIAR)Ethiopia: Lowland irrigated wheat research and production achievements (EIAR)ዳዉሮ ከገበታ ለሀገር ኮይሻ ፕሮጀከት ማግስት በኃላ…..! Koyisha project-Dawro Kontaዳዉሮ ከገበታ ለሀገር ኮይሻ ፕሮጀከት ማግስት በኃላ…..! Koyisha project-Dawro KontaETHIOPIA WATER PROJECT | Shewa Region | Drilling Water in the Ethiopian BackcountryETHIOPIA WATER PROJECT | Shewa Region | Drilling Water in the Ethiopian BackcountryNew Update | Full Reservoir | Gibe III dam (Ethiopia) opens 4 of its 7 spillway gates | October 2020New Update | Full Reservoir | Gibe III dam (Ethiopia) opens 4 of its 7 spillway gates | October 2020KOYSHA, WENCHI AND GORGORA FULL VIDEO HDKOYSHA, WENCHI AND GORGORA FULL VIDEO HDProgress in Peru - Hydroelectric power for remote villages | Global 3000Progress in Peru - Hydroelectric power for remote villages | Global 3000
Яндекс.Метрика