Загрузка страницы

Prepare Presentation for Project Defense | Structural Analysis of Building | NBC 105, IS 456 | ETABS

In this video, I will show you how to prepare a PowerPoint presentation for structural analysis and design of a building for project defence considering NBC 105:2020 and IS code.

Do like and subscribe to us.

Only paid requests will be accessed.

Excel sheet link:
Structure Report (Word file):
https://docs.google.com/document/d/1J-R7sl5HfNMh29Wqefs1g5Gxvhq3H3xP/edit?usp=drive_link&ouid=108896043731268656786&rtpof=true&sd=true

1) Structural Report Combo: (All Discounted price: Rs 4500)

OR

Structural Report (Equivalent Static Method): Rs 1000
Structural Report (Response Spectrum Method): Rs 1200
Structural Report (Commercial Steel Building with Wind load and Earthquake load): Rs 1200
Structural Report (Warehouse (factory type) Steel Building with roof truss with Wind load and Earthquake load): Rs 1200
Structural Report (Commercial building with steel roof truss at the top considering Response Spectrum Method and Wind load): Rs 1500

Видео Prepare Presentation for Project Defense | Structural Analysis of Building | NBC 105, IS 456 | ETABS канала Parash Joshi - Civil Construction and Tutor
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
16 июня 2023 г. 18:07:33
00:24:30
Другие видео канала
Modeling of Tapered wall  SAP2000 | How to determine the depth of section | Retaining wall FloodwallModeling of Tapered wall SAP2000 | How to determine the depth of section | Retaining wall FloodwallDesign of circular water tank Part 1 | Structure & Stability Analysis | Hydropower Engineering |Design of circular water tank Part 1 | Structure & Stability Analysis | Hydropower Engineering |Braced RCC Column| Design of RCC Structures | Mumbai University | IOE , TU , PUBraced RCC Column| Design of RCC Structures | Mumbai University | IOE , TU , PUThree Hinged Parabolic Arch Part I | Structural Analysis I | Theory of Structure IThree Hinged Parabolic Arch Part I | Structural Analysis I | Theory of Structure IRCC Basement wall design (Manually) | ETABS Modeling of Multistory Building | NBC 105:2020, IS 1983RCC Basement wall design (Manually) | ETABS Modeling of Multistory Building | NBC 105:2020, IS 1983Calculation and Assigning Uplift Pressure | Surface and Subsurface Drainage | Uplift Coefficient |Calculation and Assigning Uplift Pressure | Surface and Subsurface Drainage | Uplift Coefficient |Total Station Set up in 1 minute | Learn From Site |Total Station Set up in 1 minute | Learn From Site |Design of Steel Truss Connection Part 3 (Bottom rafter and struts) IS 800 | ETABS & IDEA STATICA |Design of Steel Truss Connection Part 3 (Bottom rafter and struts) IS 800 | ETABS & IDEA STATICA |Design of Forebay Part I | Hydropower Engineering Mumbai University | IOE , TU , PUDesign of Forebay Part I | Hydropower Engineering Mumbai University | IOE , TU , PURiver Water Rafting in Bhotekoshi | Campfire Sukute Beach Nepal |River Water Rafting in Bhotekoshi | Campfire Sukute Beach Nepal |Manual Design of Shear Connection (Web Side/ Fin Plate ) in Excel  | Steel Structure | IS AISC CodeManual Design of Shear Connection (Web Side/ Fin Plate ) in Excel | Steel Structure | IS AISC CodeBig Mistakes In RCC Column ConstructionBig Mistakes In RCC Column ConstructionMarine Concrete - Chloride Penetration TestMarine Concrete - Chloride Penetration TestModeling of Residential Building G+3 stories | ETABS Tutorial Part 5 | As per IS 456 | Learn at homeModeling of Residential Building G+3 stories | ETABS Tutorial Part 5 | As per IS 456 | Learn at homeDamped Forced Vibration | SDOF System | Structural DynamicsDamped Forced Vibration | SDOF System | Structural DynamicsETABS Modeling and Analysis of Residential Building | Define Material and Section Properties Part 3ETABS Modeling and Analysis of Residential Building | Define Material and Section Properties Part 3Design of circular water tank Part 2 | Structure Analysis & Design | Hydropower Engineering |Design of circular water tank Part 2 | Structure Analysis & Design | Hydropower Engineering |Shear connection design between beam and column Part 5 | IS 800:2007 | ETABS & IDEA STATICA |Shear connection design between beam and column Part 5 | IS 800:2007 | ETABS & IDEA STATICA |Fun From Site | Tiktok CompilationFun From Site | Tiktok CompilationMass irregularity check | ETABS Analysis of Multi-Storied Building | NBC 105:2020 , IS 1893:2016Mass irregularity check | ETABS Analysis of Multi-Storied Building | NBC 105:2020 , IS 1893:2016Types of Beam Section | Balanced, Under and Over Reinforced Cases | Design of RCCTypes of Beam Section | Balanced, Under and Over Reinforced Cases | Design of RCC
Яндекс.Метрика