DETAILS OF CONSTRUCTION PROCESS WITH NOTES | HOW TO CALCULATE BUILDING ESTIMATE

Invest for Practical + Software Training Course :
https://www.civilguruji.com/s/store/courses/description/COPs-Lifetime
Apply Code for Discount :- GURUJI

Call for Assistance : 9111001234

HELLO CIVIL ENGINEERS,
WELCOME TO WORLD OF CIVILGURUJI....
Fresher Engineer Should Know Reality of Industry & Demand for Skills before INVESTING Money

The 'construction process' (sometimes called the 'construction stage') is the physical processes of building, landscaping or refurbishing plus all the associated activities, such as demolition, site clearance, administration and so on.
The process of calculation of quantities and COST of various items in connection with the construction project is called an estimate.
The phases of building construction can typically be divided into five phases: initiation, planning, execution, monitoring, and the completion.
IN THIS NOTES, WE WILL KNOW ABOUT COMPLETE BUILDING ESTIMATION FROM SITE CLEANING TO PROJECT HANDOVER.
The process of site cleaning is much more complicated than a typical cleaning job due to the nature of the materials being removed from the work site. There will grass, trees, vegetation, disposal & unserviceable materials are in the site, so these items are to be cleaned before construction process is to be done. In site cleaning measurements are done in area (sqm) up to two decimal places, & take 1m extra in all direction for site cleaning.
Excavation is the process of moving earth, rock or other materials with tools, equipment or explosives. ➢ All excavation operations shall include excavation and getting out the excavated materials. The excavation shall conform to the lines & levels shown in the drawings. ➢ Excavation can be done by mechanical or manual means as per choice/ ease of contractor and conditions of site. ➢ Excavation where directed by the Engineer-in-Charge shall be securely fenced and provided with proper caution signs, conspicuously displayed during the day and properly illuminated with red lights during the night to avoid accidents. ➢ Pumping out of water during excavation shall be measured in cum and shall be payable one time for the entire operation of excavation. Height for calculating volume shall be based on the difference of water level and the bottom level of the excavated pit. ➢ Excavation can be calculated in (cum) up to three decimal places as per given drawing or modified dimensions, & take extra 100mm in all each side. ➢ Any damages done by the contractor to any existing work shall be made good by him at his own cost.
Sand filling is done in footing we can’t place concrete directly on the earth soil because it affects the mix design. ➢ If the footing is placed directly on the earth surface, if small amount of vibration on the earth (during an earthquake) will make structure collapse. Sand is minimizing the resistance. ➢ Calculating quantity of sand filling in volume unit is in (cum). ➢ We have done sand filling 4” to 8”. (i.e. =100mm to 200mm height).
PCC is done below footing for provide footing hard base when we apply foam work it make stable base. ➢ Pcc height is taken 4” to 6” (i.e., 0.1m to 0.15m) ➢ It may calculate volume of pcc in (cum).
Footing is one of the most important parts of a structure which transfer loads of the structure to the underlying soil. The selection of footing depends upon the following steps. ➢ The depth of the soil at which safe bearing strength exists. ➢ The type and condition of soil. ➢ The type of super structure.
❖ Their are two types of foundation.
➢ Shallow foundation ➢ Deep foundation
1. Shallow foundation :- In this foundation depth is less then or equal to width. e.g.:- rectangle footing, trapezoidal footing, step footing, strap footing, combined footing, mat/raft.
1. Deep foundation :- In this foundation depth is more then its width. e.g. :- pile footing.
In pedestal column also calculate volume in (cum). ➢Pedestal column is footing base up to natural ground level. ➢Column dimension is provided in your drawing (for ex. 250mm*400mm) ➢Dimension of pedestal column is given in the drawing. ➢*Height is calculated as (Total excavated ht.-sand filling ht.pcc ht.- footing ht.)
Pedestal column shuttering area is to be calculated by the total contact surface of the concrete is to be poured. ➢So we calculate by (sum of all sides of column * ht. Of pedestal column.
PEDESTAL COLUMN SHUTTERING
➢Height is calculated as (Total excavated ht.-sand filling ht.- pcc ht.footing ht.)
Backfilling is calculating in volume (cum). ➢In backfilling, soil is more compacted & tightly bound when we excavated the soil is in loose condition due to air voids that by its volume increase up to 40% . ➢ *Total backfilling calculation = total excavated qty. – sand filling qty. – pcc qty. – footing concrete qty. –pedestal column qty.

Видео DETAILS OF CONSTRUCTION PROCESS WITH NOTES | HOW TO CALCULATE BUILDING ESTIMATE BY CIVIL GURUJI канала Civil Engineers Training Institute
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
8 июля 2020 г. 14:30:12
01:03:10
Другие видео канала
Detailed Estimation Strategy of Building Structure | 140 X 40 Ft (Part- 1) || By Civil GurujiDetailed Estimation Strategy of Building Structure | 140 X 40 Ft (Part- 1) || By Civil GurujiBasic Knowledge of SLAB क्यों होता है ONE WAY या TWO WAY #civilengineer #civilgurujiBasic Knowledge of SLAB क्यों होता है ONE WAY या TWO WAY #civilengineer #civilgurujiHow To Check Bearing Capacity of Soil At Site | What Is Safe & Ultimate Bearing Capacity.How To Check Bearing Capacity of Soil At Site | What Is Safe & Ultimate Bearing Capacity.Types Of Admixtures Used In Construction | Type of Concrete Admixtures and their uses | #CivilGurujiTypes Of Admixtures Used In Construction | Type of Concrete Admixtures and their uses | #CivilGurujiHow to calculate the Quantity of Shuttering Material like Plywood, Batten, Nails, Props, Jacks etc.How to calculate the Quantity of Shuttering Material like Plywood, Batten, Nails, Props, Jacks etc.Piling Process | Pile Foundation | Deep Foundation | Pile Steel & Concreting steps || By CivilGurujiPiling Process | Pile Foundation | Deep Foundation | Pile Steel & Concreting steps || By CivilGurujiStep By Step Indian 30*40 house construction, time lapse - 5 months work in 48 minutesStep By Step Indian 30*40 house construction, time lapse - 5 months work in 48 minutesTop Business ideas for Civil Engineers | क्या Civil Engineering आपको अमीर बना सकता है By CivilGurujiTop Business ideas for Civil Engineers | क्या Civil Engineering आपको अमीर बना सकता है By CivilGurujiDifference Between Centric And E Centric Footing | Eccentric Footing || By Civil GurujiDifference Between Centric And E Centric Footing | Eccentric Footing || By Civil GurujiMost Important 7 Skills for CIVIL ENGINEER to Grow in their CAREER!! #civilgurujiMost Important 7 Skills for CIVIL ENGINEER to Grow in their CAREER!! #civilgurujiBasic Details of Drawing Reading at Construction Site | What are detailed Drawings in Construction.Basic Details of Drawing Reading at Construction Site | What are detailed Drawings in Construction.Civil Engineering Common Interview Questions | Job Interview Q & A for Civil Engineers #CivilGurujiCivil Engineering Common Interview Questions | Job Interview Q & A for Civil Engineers #CivilGurujiBBS - Bar Bending Schedule of Beam ! How Steel is placed in Beam & Cutting Length ! Basic KnowledgeBBS - Bar Bending Schedule of Beam ! How Steel is placed in Beam & Cutting Length ! Basic KnowledgeHow R.N Shetty 10th Pass Civil Contractor Owns 2000 Crore Company || By CivilGurujiHow R.N Shetty 10th Pass Civil Contractor Owns 2000 Crore Company || By CivilGurujiComplete Building Construction Step By Step Process HindiComplete Building Construction Step By Step Process HindiLearn complete Bar Bending Schedule (BBS) for One Way & Two Way Slab #CivilgurujiLearn complete Bar Bending Schedule (BBS) for One Way & Two Way Slab #CivilgurujiDOUBT SESSION ON QUANTITY SURVEY AND RATE ANALYSIS \ आज मिलेगा आपके सवालो का जवाब  BY CIVIL GURUJIDOUBT SESSION ON QUANTITY SURVEY AND RATE ANALYSIS \ आज मिलेगा आपके सवालो का जवाब BY CIVIL GURUJIcomplete construction of RCC -DESIGNcomplete construction of RCC -DESIGNHow Load Transfer from Slab to Foundation || Building Types on the basis of Load Transfer Mechanism.How Load Transfer from Slab to Foundation || Building Types on the basis of Load Transfer Mechanism.
Яндекс.Метрика