SLS RS-25 Engine Test, 28 April 2021
An Aerojet Rocketdyne RS-25 rocket engine was tested on the A-1 Test Stand at the John C. Stennis Space Center in Mississippi, on 28 April 2021, at 19:48 UTC (14:48 CDT, 15:48 EDT). The test was conducted using the RS-25 developmental engine No. 0528 and had a planned duration of 650 seconds. This RS-25 hot-fire test is part of the Retrofit-2 test series, aiming to evaluate new engine components and reduce risk in engine operation. NASA’s Space Launch System (SLS) will be powered by four RS-25 engines firing simultaneously.
Credit: NASA
#RS25
Видео SLS RS-25 Engine Test, 28 April 2021 канала SciNews
Credit: NASA
#RS25
Видео SLS RS-25 Engine Test, 28 April 2021 канала SciNews
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
SpaceX Starlink 167 launch and Falcon 9 first stage landing, 23 May 2024Messier 78 imaged by Euclid (4K UHD)Kuaizhou-11 launches 4 satellitesLong March-2D launches four Beijing-3C satellitesFalcon 9 launches NROL-146 and Falcon 9 first stage landingFalcon 9 launches Intelsat G-33/G-34 and Falcon 9 first stage landingElectron launches “The Beat Goes On”SpaceX Starlink 168 launch and Falcon 9 first stage landing, 24 May 2024Long March-2D launches Gaofen-5 01AShenzhou-14 astronauts enter MengtianMengtian dockingMengtian docking and transpositionShenzhou-16 dockingShenzhou-16 hatch openingLijian-1 first launch (ZK-1A)Kuaizhou-11 launches VDESOFT-2 Starliner docking to the International Space StationWhat’s next for the China Space Station in 2022 and 2023Shenzhou-14 astronauts egressTianzhou-5 - The Fastest Spacecraft to the China Space StationProgress MS-17 undocking and departure