Загрузка страницы
Информация о видео
1 августа 2020 г. 15:11:53
00:09:24
Другие видео канала
BALANCED WYE - DELTA SYSTEM CALCULATION and SOLVING PROBLEM ANALYSISBALANCED WYE - DELTA SYSTEM CALCULATION and SOLVING PROBLEM ANALYSISWHY MY ALEXA VOICE & SOUND DEVICE INSTALLED SMART WIFI LIGHT SWITCH DID NOT FUNCTION?WHY MY ALEXA VOICE & SOUND DEVICE INSTALLED SMART WIFI LIGHT SWITCH DID NOT FUNCTION?THE PROPER SIZING OF WIRE & ITS CORRESPONDING BREAKER TO PROTECT THE CABLE FROM OVERLOAD SCENARIOTHE PROPER SIZING OF WIRE & ITS CORRESPONDING BREAKER TO PROTECT THE CABLE FROM OVERLOAD SCENARIOPOWER LOSS COMPARATIVE ANALYSIS BETWEEN 1-θ & 3-θ SYSTEMSPOWER LOSS COMPARATIVE ANALYSIS BETWEEN 1-θ & 3-θ SYSTEMSPHASE SEQUENCE(+,-,0) DESCRIPTIONS BY FORTESCUES THEOREMPHASE SEQUENCE(+,-,0) DESCRIPTIONS BY FORTESCUES THEOREMBALANCED WYE-DELTA SYSTEM (Line Voltage & Current Basic Relationship to Phase Voltage & Current)BALANCED WYE-DELTA SYSTEM (Line Voltage & Current Basic Relationship to Phase Voltage & Current)CALCULATION & SIZING OF ACU CONDUCTOR & OCPD BASED ON ITS NAMEPLATE SPECIFICATIONSCALCULATION & SIZING OF ACU CONDUCTOR & OCPD BASED ON ITS NAMEPLATE SPECIFICATIONSMGA PREVENTIVE TIPS KUNG PAANO MAIWASAN ANG ELECTRIC SHOCK SA LOOB NG ATING MGA BAHAYMGA PREVENTIVE TIPS KUNG PAANO MAIWASAN ANG ELECTRIC SHOCK SA LOOB NG ATING MGA BAHAYCALCULATION & SIZING OF MOTOR CONTINOUS DUTY APPLICATIONCALCULATION & SIZING OF MOTOR CONTINOUS DUTY APPLICATION3 PHASE NEUTRAL CALCULATION OF WYE SOLIDLY GROUNDED SYSTEM3 PHASE NEUTRAL CALCULATION OF WYE SOLIDLY GROUNDED SYSTEMFAULTY ELECTRICAL WIRINGS ..ANO ANG MGA SANHI AT DAPAT GAWIN PARA MAIWASAN ANG SUNOGFAULTY ELECTRICAL WIRINGS ..ANO ANG MGA SANHI AT DAPAT GAWIN PARA MAIWASAN ANG SUNOGMANUAL REMOTE SWITCHING CONTROL OF COs USING 2 -3WAY SWITCHES AND ONE WAY SWITCH  INSTALLATION.MANUAL REMOTE SWITCHING CONTROL OF COs USING 2 -3WAY SWITCHES AND ONE WAY SWITCH INSTALLATION.HOW TO CALCULATE & DERATE RECEPTACLES or CO's EXCEEDING 10KVA OF ITS LOAD based on PEC 2017HOW TO CALCULATE & DERATE RECEPTACLES or CO's EXCEEDING 10KVA OF ITS LOAD based on PEC 2017THE "EVIL" INFLUENCE OF HARMONICS IN OUR POWER SYSTEMTHE "EVIL" INFLUENCE OF HARMONICS IN OUR POWER SYSTEMOPEN DELTA POWER REDUCTION ANALYSISOPEN DELTA POWER REDUCTION ANALYSISTHE MEPFS & ARCHITECTURAL, STRUCTURAL DESIGN & CONSTRUCT OF  A 3 STOREY RESIDENTIAL PROJECTTHE MEPFS & ARCHITECTURAL, STRUCTURAL DESIGN & CONSTRUCT OF A 3 STOREY RESIDENTIAL PROJECTANG TAMANG CALCULATION NG # OF LIGHTS SA  15A BRANCH CIRCUIT NA DAPAT MALAMAN NG MGA ELECTRICIAN.ANG TAMANG CALCULATION NG # OF LIGHTS SA 15A BRANCH CIRCUIT NA DAPAT MALAMAN NG MGA ELECTRICIAN.POLAR TO RECTANGULAR CONVERSION SCHEME APPLICATIONPOLAR TO RECTANGULAR CONVERSION SCHEME APPLICATIONMULTIPLE VS SINGLE SERVICE ENTRANCE DESIGN & INSTALLATION IN A TYPICAL MULTI- DWELLING UNITSMULTIPLE VS SINGLE SERVICE ENTRANCE DESIGN & INSTALLATION IN A TYPICAL MULTI- DWELLING UNITSBakit ang 1Pole Switch sa bulb connection na L-L 230v ay PEC  CODE VIOLATION? Atin pong ALAMIN.Bakit ang 1Pole Switch sa bulb connection na L-L 230v ay PEC CODE VIOLATION? Atin pong ALAMIN.
Яндекс.Метрика