Plaza Tower Implosion - Controlled Demolition, Inc.
Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, USA (acting as Explosives Subcontractor to Main Demolition Contractor, Haines & Kibblehouse, Inc. of Philadelphia, Pennsylvania) performs the successful planning of, drilling for and explosives felling of the 34-story, reinforced concrete Plaza Tower in Atlantic City, New Jersey on Wednesday, February 17, 2021.
The 34-story tower was 370' tall. CDI loaded 1,900 lbs of explosives in 2,300 locations over 14 floors of the structure and installed over 700 delays using a non-electric initiation system to carefully control the fall of the structure while maximizing debris fragmentation to facilitate removal of the tidy 70' tall pile of post-implosion debris.
Видео Plaza Tower Implosion - Controlled Demolition, Inc. канала TheLoizeauxGroupLLC
The 34-story tower was 370' tall. CDI loaded 1,900 lbs of explosives in 2,300 locations over 14 floors of the structure and installed over 700 delays using a non-electric initiation system to carefully control the fall of the structure while maximizing debris fragmentation to facilitate removal of the tidy 70' tall pile of post-implosion debris.
Видео Plaza Tower Implosion - Controlled Demolition, Inc. канала TheLoizeauxGroupLLC
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Frontier Hotel - Controlled Demolition, Inc.Felling of a Thermally Damaged Wind Turbine - Controlled Demolition, Inc.420 Main Street Building (Old National Bank) - Controlled Demolition, Inc.Holiday Inn Rosslyn - Controlled Demolition, Inc.WOW Demolition 1,000 feet up. Gotta see this!One James River Plaza Tower - Controlled Demolition, Inc.Coal Fired Hung Boiler, Coal Silo Bay, and Ash Silo – Controlled Demolition, Inc.Berkman II Building - Controlled Demolition, Inc.Capital Plaza Office Tower - Controlled Demolition, Inc.Plant Gorgas Hung Boilers, SCR, and Vent Chimney - Controlled Demolition, Inc.Pinto Creek Bridge - Controlled Demolition, Inc.Miami Resort | Building Demolition | BlowDown | S01 E03| Free DocumentaryAll Hotel Implosions in Las Vegas 2020Dairyland Steam Power Station Chimney - Controlled Demolition, Inc.Nucla Power Plant Unit #4 Boiler House and Steel Stack - Controlled Demolition, Inc.4 building demolition methodsFelling of Mitsubishi 1000A Wind Turbines - Controlled Demolition, Inc.Carmichael Towers #1 and #2 @ Vanderbilt University - Controlled Demolition, Inc.Plant Gorgas 370’ FGD Chimney - Controlled Demolition, Inc.