Загрузка страницы

Pilot project proves that the dismount and reuse of concrete elements is realistic and economical

At the end of 2021, Peikko implemented a pilot project in which a load-bearing structure of concrete elements was installed, dismantled, and reinstalled. In a pilot frame, which was implemented under the pilot project, disassembly and reusability resulted in approximately 35% cost savings and 50% lower emissions, regardless of whether the entire floor structure was implemented with wet or dry joints.
Read more about the project:
https://www.peikko.com/blog/pilot-project-proves-that-the-dismount-and-reuse-of-concrete-elements-is-realistic-and-economical/?utm_source=youtube&utm_medium=social_owned

Видео Pilot project proves that the dismount and reuse of concrete elements is realistic and economical канала Peikko Group
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
28 июня 2022 г. 17:12:24
00:02:37
Яндекс.Метрика