Загрузка страницы

Tesla Gigafactory 4 Berlin | Air conditioning systems | November 22, 2020 | DJI Mavic 2 Pro 4K Video

Todays building progress of the Gigafactory Berlin. First air conditioning systems got delivered and there were harvesters spotted on the site for more tree clearance.
If you like my work, I would be happy about a little support :
PayPal link: https://www.paypal.me/flybrandenburg
Patreon link: https://www.patreon.com/flybrandenburg
I am happy about every donation so that the trips to the Tesla site are still possible. At the moment, I am saving for a better computer to produce more professional videos at higher quality.

Follow me on Twitter:
https://twitter.com/flybrandenburg

You are about to order a Tesla?
Get 1000 free Miles of Supercharging with this code:
http://ts.la/thomas3449

Chapters:
0:00 Casting and paint shop
1:14 Moving in equipment
2:20 Paint shop inside
3:05 Storage area I
4:04 General assembly
5:11 Drive unit
6:40 Casting
7:23 Harvester & excavators
8:32 Body in white
9:19 Switchyard
9:35 Air conditioning systems

10:01 Storage area II
11:23 Concrete mixing plant and excavator
12:22 Crane at general assembly
13:42 Paint shop
If you want to use my footage in your videos, please contact me to get a permission, otherwise it is illegal to use my footage.

Music used in this video:
Track 1:
Text me records - Puffs

Track 2:
Streamline - Eveningland
Track 3:
Instant crush - Corbyn Kites

Track 4:

Birds - Corbyn Kites
Track 5:
Alone - Emmit Fenn
Track 6:
Liquid time - Aakash Gandhi
Like, comment and share the video!
If you want to see more drone videos, don't hesitate to subscribe to this channel.
Thanks for watching!

Видео Tesla Gigafactory 4 Berlin | Air conditioning systems | November 22, 2020 | DJI Mavic 2 Pro 4K Video канала flybrandenburg
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
22 ноября 2020 г. 18:00:14
00:14:43
Яндекс.Метрика