Workshop build part 17 - Rear wall and fire system
The rear wall is finally done as well as adding a fire protection system for the roof and building. Next job will be building the loft...
Видео Workshop build part 17 - Rear wall and fire system канала Mezzmo Engineering
Видео Workshop build part 17 - Rear wall and fire system канала Mezzmo Engineering
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Mezzmo Engineering introWorkshop build part 13, Installing metal roofingBuilding a wood fire pizza oven Part 2Workshop Build Part 6, It's finally happening!Workshop Build part 5, Finishing the ground worksBuilding a Wood Fired oven Part 4Preparation for my new workshopYamaha XJ650 Part 9 Fuel tank and wiringCoilover review WRX GC8Suzuki U70 Part 5 No more smokeWorkshop build part 15 - Solar installSuzuki U70 Build Part 2Suzuki 1967 U70 Build Part 1Yamaha XJ650 Part 4 Front end conversionWorkshop build part 19 - Finishing the wallsRace mower trailerYamaha XJ650 Part 34 Brakes and rear lightsYamaha XJ650 Build Part 2Yamaha XJ650 Part 12 Fuel tank and Seat prepWorkshop build, Part 2 Concreting piers