Загрузка страницы

A to Z Agri Manual Instruction of Building RTL Cage (Step by step)

This is a Manual Guide on how to Build RTL Cage
Plier Tools and M nails are included on our sets when you purchase.
Total of 11 Step.
9:08 - Things you need to set up a 1 layer of "Chicken Cage"
0:16 Step 1 - first set up to Build RTL Cage
0:31 Step 2 - Loading of "M nails" on "Plier tool"
0:39 Step 3 - How Plier tool works clipping "L shape Mesh Cage and Divider"
0:59 - Distance of Divider on each other.
1:13 Step 4 - Installing of the Top Part of "L shape Mesh Cage"
1:46 Step 5 - Installing of "Back Mesh Cage"
2:28 Step 6 - Installing of "J shape Mesh Cage or Floor"
3:48 Step 7 - Installing of "Door Mesh"
4:53 Step 8 - Installing of "PVC pipe" and "Nipple Drinker with Cup"
5:06 and 5:13 - "Nipple Drinker to PVC pipe"
5:47 - PVC clip used.
6:18 and 6:23 - "Drinker Cup to Nipple Drinker"
6:30 Step 9 - Installing of "Feeder"
6:51 and 8:10 Step 10 - Set up of "Frames/Stand"
8:22 Step 11(Last Step) - Installing "Chicken Cage" to "Frame/Stand"

By: Carl Ansama of A to Z Agri Products
-----------------------------------------------------------------------------
https://www.facebook.com/AtoZSanPabloCityLaguna/
-----------------------------------------------------------------------------
https://www.facebook.com/carl.ansama
-----------------------------------------------------------------------------

Видео A to Z Agri Manual Instruction of Building RTL Cage (Step by step) канала Carl Ansama
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
9 октября 2020 г. 21:02:23
00:09:42
Яндекс.Метрика