One-week construction time-lapse with closeups: Week 25 of the Ⓢ-series

Week 25 in the ongoing Ⓢ series, which follows the construction of a new 13-story senior living building in San Francisco. This is a #construction #timelapse with various closeups and "sub-time-lapses" at various speeds, condensing the week of July 20 - 25, 2020, into about 57 minutes.

This week starts out with yet another all-day #concretepour, including an extended segment with the ride-on trowels, and we also catch glimpse of the guy down below that has to catch all the drips and leaks. The flatness-measuring-guy has a nice clear course this time, with no obstacles.

We see various views of the central core forms coming, going, and raising. A little bit of column work, but I didn't cover much of that this time. A lot of the preliminary work for post tensioning is seen, as well as another fairly good view of the #posttensioning process itself.

In the early hours of Thursday morning, a man in the alley threatens one of the security guards with a knife, and the security guard tases him in response. At that time of night, the only camera is a wide angle and only 1 frame every 10 seconds, but you can get the gist of it.

There's some exciting sewer grate work. A good view of jumping the placing boom. The site is finally getting a lift (elevator), which we take a field trip to see a little of, since the location is not viewable to us from our usual vantage point. It will be several weeks before the lift is operational and inspected, though. And since we're out on a field trip anyway, some street-level shots of the building from various angles round out the episode.

Last week I mentioned that I was going to ponder whether to change things up from the current format, with an eye towards fending off repetitiveness. After looking through the next several episodes I've decided, for better or worse, to continue on with the current format, even though there might naturally be some repetition due to the construction on each floor being similar. Actually, even when the building eventually exceeds the camera height, a fair amount of new stuff starts showing up, more than I expected. And a little bit of repetitiveness isn't so bad, I think, as it gives a somewhat realistic account of the process, and not everyone watches every episode anyway. So, on we go!

00:00 - Mon (concrete pour, core forms, column)
16:44 - Tue (form removal, post tensioning prep)
25:59 - Wed (level, post tensioning)
32:02 - Early morning incident
33:53 - Thu (core forms, sewer)
40:13 - Fri (decking, jumping boom, raising core forms)
48:56 - Sat (lift, street views)
55:30 - Closing and previews

Music licensed from Audio Network. In chronological order:

Monday:
Runaway 2 — Caitlin Donerly Linney, Andrew Lewis Dixon, Jason Gaviati (3407/43)
Hi Ho Cowboy 2 — Jody Jenkins (2972/126)
Riders Of The West — Randall Breneman, Jake Field (1179/4)
Queen 2 — Jonathan Lloyd (2809/24)

Tuesday:
To Be Me 3 — Evelyn Glennie, Igor Dvorkin (1193/36)
Bitter Sweet — Bob Bradley, Matt Sanchez, Steve Dymond, Sarah Wassall (1673/9)

Wednesday:
Work It Out 2 — Randall Breneman, Jake Field (3373/23)
Call Me 4 — Terry Devine-King, Steve Levine (1749/15)

Thursday morning incident:
Time To Think — Terry Devine-King (3397/11)

Thursday:
World They Used To Live In 5 — Thomm Jutz, Peter Cronin, Charley Stefl (1723/122)
Liquid Gold — Gareth Johnson (1491/6)

Friday:
Jahman 2 — Tom Quick, Michael Wright (1517/13)
Spit Spot — Terry Devine-King, Adam Drake (3382/6)

Saturday:
Supercars 2 — Paddy Conn, Angelina Dove (3170/56)
Our First Kiss 2 — Matt Goodman, Mansergh Jamal Griffith (3384/66)

Closing and previews:
Crack On — Chris Fairbrass, Richard Fairbrass, Neil Sidwell (2686/8)

As usual, you're always welcome to listen to your own playlist instead if you prefer (there's no dialog in the video).

This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.

Видео One-week construction time-lapse with closeups: Week 25 of the Ⓢ-series канала Hospital Construction
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
30 августа 2020 г. 5:32:12
00:57:29
Другие видео канала
Wheel loader moving dirt from point A to point B at 4x: Musical time-lapse (Weeks 33+34 set 1)Wheel loader moving dirt from point A to point B at 4x: Musical time-lapse (Weeks 33+34 set 1)Spreading gravel: Musical construction time-lapse (Weeks 33+34 set 2)Spreading gravel: Musical construction time-lapse (Weeks 33+34 set 2)2-week construction time-lapse w/closeups: Ⓗ Weeks 219+220: Lotsa bricks, traffic light move2-week construction time-lapse w/closeups: Ⓗ Weeks 219+220: Lotsa bricks, traffic light moveThe concrete pumping samba (Ⓗ Week 40 construction clips set #1)The concrete pumping samba (Ⓗ Week 40 construction clips set #1)1-week construction time-lapse w/over 30 closeups: Ⓗ Week 75: Ironworkers; cranes; welders; concrete1-week construction time-lapse w/over 30 closeups: Ⓗ Week 75: Ironworkers; cranes; welders; concrete91 trucks in 3 minutes - time-lapse (Ⓗ Weeks 5 to 8, construction clips set 2)91 trucks in 3 minutes - time-lapse (Ⓗ Weeks 5 to 8, construction clips set 2)Climbin' excavator (Ⓗ Week 36 construction clips set #3)Climbin' excavator (Ⓗ Week 36 construction clips set #3)An excavator flexing its unattached snout (Ⓗ Week 28, construction clips set 2)An excavator flexing its unattached snout (Ⓗ Week 28, construction clips set 2)Leftovers: Deleted/unused scenes from Ⓗ Week 59's construction time-lapseLeftovers: Deleted/unused scenes from Ⓗ Week 59's construction time-lapseOne-week construction time-lapse w/over 22 closeups: Ⓗ Week 74: Ironworkers; cranes; welders; moreOne-week construction time-lapse w/over 22 closeups: Ⓗ Week 74: Ironworkers; cranes; welders; moreGlass Curtain Wall Time-lapse Compilation / Musical (from Ⓗ Weeks 93, 94, and 95)Glass Curtain Wall Time-lapse Compilation / Musical (from Ⓗ Weeks 93, 94, and 95)2 hours of concrete pumping video compressed into 6½ minutes (Ⓗ Week 39 construction clips set #1)2 hours of concrete pumping video compressed into 6½ minutes (Ⓗ Week 39 construction clips set #1)Reversable excavator attachment (Ⓗ Weeks 5 to 8, construction clips set 1)Reversable excavator attachment (Ⓗ Weeks 5 to 8, construction clips set 1)Forty-six buckets of dirt at 10X (Ⓗ Week 36 construction clips set #4)Forty-six buckets of dirt at 10X (Ⓗ Week 36 construction clips set #4)Dirt in motion: Mellow musical montage of construction time-lapses (Ⓗ Weeks 12 to 14, set 1)Dirt in motion: Mellow musical montage of construction time-lapses (Ⓗ Weeks 12 to 14, set 1)Pumping concrete into big pits (Ⓗ Week 29, construction clips set 1)Pumping concrete into big pits (Ⓗ Week 29, construction clips set 1)One-week construction time-lapse with 35 closeups: Ⓗ Week 92: Exterior glass, cranes, welders, moreOne-week construction time-lapse with 35 closeups: Ⓗ Week 92: Exterior glass, cranes, welders, moreConstruction time-lapse with bonus highlights/closeups: Ⓗ Week 20Construction time-lapse with bonus highlights/closeups: Ⓗ Week 20One-week construction time-lapse with over 32 closeups: Ⓗ Week 85: Cranes, welders, moreOne-week construction time-lapse with over 32 closeups: Ⓗ Week 85: Cranes, welders, moreOne-week construction time-lapse with highlights/closeups: Ⓗ Week 218One-week construction time-lapse with highlights/closeups: Ⓗ Week 218One-week construction time-lapse with 20 closeups: Ⓗ Week 78: A short, rainy, holiday weekOne-week construction time-lapse with 20 closeups: Ⓗ Week 78: A short, rainy, holiday week
Яндекс.Метрика