Загрузка страницы

SLS RS-25 Engine Test, 15 November 2023

An Aerojet Rocketdyne RS-25 rocket engine (RS-25 developmental engine E0525) was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on 15 November 2023, at 20:45 UTC (14:45 CST). This was the second hot fire test out of the 12 planned in the final round of certification testing ahead of production of an updated set of engines for NASA’s Space Launch System (SLS) that will be used beginning with Artemis V. The test had a planned duration of 500 seconds, with the RS-25 engine running up to 113% power level, more than the level needed to power SLS.
Credit: NASA
#RS25

Видео SLS RS-25 Engine Test, 15 November 2023 канала SciNews
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
16 ноября 2023 г. 2:10:47
00:09:01
Яндекс.Метрика