SLS RS-25 Engine Test, 15 November 2023
An Aerojet Rocketdyne RS-25 rocket engine (RS-25 developmental engine E0525) was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on 15 November 2023, at 20:45 UTC (14:45 CST). This was the second hot fire test out of the 12 planned in the final round of certification testing ahead of production of an updated set of engines for NASA’s Space Launch System (SLS) that will be used beginning with Artemis V. The test had a planned duration of 500 seconds, with the RS-25 engine running up to 113% power level, more than the level needed to power SLS.
Credit: NASA
#RS25
Видео SLS RS-25 Engine Test, 15 November 2023 канала SciNews
Credit: NASA
#RS25
Видео SLS RS-25 Engine Test, 15 November 2023 канала SciNews
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Falcon 9 launches Intelsat G-33/G-34 and Falcon 9 first stage landingSpaceX Starlink 160 launch and Falcon 9 first stage landing, 3 May 2024Electron launches “The Beat Goes On”Long March-2D launches Gaofen-5 01AShenzhou-14 astronauts enter MengtianMengtian dockingMengtian docking and transpositionShenzhou-16 dockingShenzhou-16 hatch openingLijian-1 first launch (ZK-1A)OFT-2 Starliner docking to the International Space StationWhat’s next for the China Space Station in 2022 and 2023Shenzhou-14 astronauts egressTianzhou-5 - The Fastest Spacecraft to the China Space StationProgress MS-17 undocking and departureChina Space Station seen from Tianzhou-4Juice mission - orbit and timeline (4K)Soyuz MS-20 launch (On-board camera view)Soyuz MS-18 “Y. A. Gagarin” hatch openingMengtian launchShenzhou-17 landing