Nabralift Installation Process
This video shows the installation process of the Nabralift self-erecting tower.
The images come from the installation of the first two towers in Spain and Morocco.
Firstly you will be see an innovative Pile Foundation that saves up to an 80% of concrete compared with a standard foundation. Thanks to it the foundation is also about 60% cheaper and all the process is done within three days.
Secondly, you might see the installation of the foundation process, which was done in just two days.
Thirdly comes the installation of the standard tubular tower and nacelle by means of a small crane.
And finally the self-erecting system, which installs Nabralift frames in just two days.
Видео Nabralift Installation Process канала Nabrawind
The images come from the installation of the first two towers in Spain and Morocco.
Firstly you will be see an innovative Pile Foundation that saves up to an 80% of concrete compared with a standard foundation. Thanks to it the foundation is also about 60% cheaper and all the process is done within three days.
Secondly, you might see the installation of the foundation process, which was done in just two days.
Thirdly comes the installation of the standard tubular tower and nacelle by means of a small crane.
And finally the self-erecting system, which installs Nabralift frames in just two days.
Видео Nabralift Installation Process канала Nabrawind
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
BladeRunner uninstalls and installs a a Nordex N149 blade in an ACCIONA Energia Wind FarmNabralift Self-erecting SystemSkylift: the craneless wind turbine installation system is already realNabralift Self-Erection Process; Africa's Highest Wind Turbine InstallationNabrajoint Manufacturing and AssemblyNabrawind Intelectual Property - Renewable Energy OEPM WebinarNabrabase Corporate Video 2024Nabrawind Innovative Portfolio - Reoltec WebinarSkylift Corporate Video 2024NabraWomen 2024 - Alicia MásNabrawind products for ChinaNabrajoint full scale assemblyBladeRunner Corporate Video 2024Nabralift 2.0 Certification ProcessNaBrabase TowerHow Nabrawind developed the BladeRunnerFirst Nabralift Pile FoundationNabrawindNabrawomen - InternationalWomensDay2023NabraWomen 2024 - Victoria GonzalezNabralift Top View