Загрузка страницы

Design Proposals for section Žeimiai to Šėta (Lithuania)

The section Žeimiai-Šėta is 17,7 km long includes 3 road viaducts, 1 passing loop, 2 large and 9 small animal passages that will ensure that they will be able to safely cross underneath the railway.
Roads Žeimiai-Liepiai, Kėdainiai-Šėta-Ukmergė and one local road will intersect with the railway via overpasses. There will be no single level crossings throughout the whole Rail Baltica line to guarantee security of the railway and people.
Four local roads will be closed in this section. To cross the railway, people will be able to use 3 road crossings, on average every 5 kilometers in this section.
This section also includes 1 regional stop at Pasraučiai. It will be up to Lithuanian government to manage and develop these services on a later stage.

About RB Rail AS

“RB Rail AS” is a joint venture between the three Baltic States established in October 2014. Holding equal shares in “RB Rail AS” are SIA “Eiropas dzelzceļa līnijas” in Latvia, UAB “Rail Baltica statyba” in Lithuania and OU “Rail Baltic Estonia” in Estonia. “RB Rail AS” is the central coordinator for the Rail Baltica project. The project involves the construction of a high-speed railway infrastructure from Tallinn to the Lithuanian/Polish border. Rail Baltica will be an electrified public use rail line, an environmentally friendly and modern form of transportation.

Visit the official website of the Rail Baltica Global Project: http://railbaltica.org/

Видео Design Proposals for section Žeimiai to Šėta (Lithuania) канала Rail Baltica
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
31 июля 2020 г. 14:22:50
00:03:35
Яндекс.Метрика