Heavy Crane Lifting Wind Turbine Foundation Piles

This footage showcases the complex heavy lifting operations required for wind turbine installations, where millimeter-level precision meets megawatt-scale renewable energy projects.

Engineering Highlights
• Mega-Lift Capacity: 500-ton crane working at 80% load
• Foundation Technology: Precast reinforced concrete piles
• Green Construction: Zero-emission installation process

Lifting Sequence

1.Pre-Lift Preparation
Ground pressure analysis (5kg/cm² max)
Pile orientation marking
Sling angle verification (60° optimal)
2.Critical Lift Phase
Dual-hoist synchronized lifting
Real-time load monitoring
Anti-sway system activation
3.Final Positioning
Laser-guided alignment (±3mm tolerance)
Grout bed preparation
Immediate bolt tensioning
Equipment Specifications
• Crane Type: 500-ton Liebherr LR 1500
• Boom Length: 84m main boom configuration
• Control System: ICC (Integrated Crane Control)

Safety Systems

Automatic wind speed limiter (12m/s cutoff)
Load moment indicator with 3x redundancy
Emergency lowering system
Project Impact

Supports 5MW turbine installations
Enables 30,000+ hour turbine lifespan
Paves way for 200+ household energy supply
This engineering feat demonstrates how heavy lifting technology enables the renewable energy transition, combining brute strength with space-age precision for sustainable power generation.