Multiple Yamamoto HRB-1000 Rock Splitters simultaneously
This job in Sweden involved removing rock to install a second train track. There was an oil refinery on one side and oil storage tanks on the other side. Our client used 5 pieces of HRB-1000 simultaneously to maximise productivity. The hole spacing could be increased from normal 0.6 meter to 1.2 meter and many times the split went all the way to the bottom, roughly 3 meter. The customer hade done wire cutting on one side and in the bottom to support the splitter.
For more details, please visit www.yamamotorrocksplitter.com
Видео Multiple Yamamoto HRB-1000 Rock Splitters simultaneously канала Yamamoto Rock Splitter
For more details, please visit www.yamamotorrocksplitter.com
Видео Multiple Yamamoto HRB-1000 Rock Splitters simultaneously канала Yamamoto Rock Splitter
Показать
Комментарии отсутствуют
Информация о видео
21 февраля 2019 г. 16:30:14
00:02:19
Другие видео канала
Excavation of train station in Montreal, CanadaTrench for sewage in a residential area in Westpoint, NY, with hydraulic rock splitter HRB-1000Yamamoto Rock SplitterYamamoto Rock Splitter HRB-1000 for a building foundation in SwitzerlandIntroduction of Yamamoto Rock Splitter HRB-1000 at a job siteYamamoto Rock Splitter HRB-1700 in a limestone mine in Rajasthan, IndiaLand development in Karlskrona, Sweden, with hydraulic rock splitter HRB-1000Yamamoto Hydraulic Rock Splitter HRB-1000 in AlgeriaYamamoto HRB-1700 in SwedenYamamoto HRB-1000 with 76mm wedges in Montreal, CanadaYamamoto Rock Splitter HRB-1000 in Concrete DemolitionYamamoto Rock Splitter HRB-1000 in NorwayUsing 2 units of HRB-1000 in parallelYamamoto Rock Splitter - Replacing wedge and feathersHRB-1000 for tunnelling in Gothenburg, SwedenFive units of HRB-1000 used simultaneously