One-week construction time-lapse with closeups: Week 34 of the Ⓢ-series

Week 34 in the ongoing Ⓢ series, which follows the construction of a new 13-story senior living building in San Francisco. This is a #construction #timelapse with various closeups and "sub-time-lapses" at various speeds, condensing the week of September 21 - 26, 2020, into about 50 minutes.

On Monday, there's framing work and pipe and doorframe delivery, as well as some sweeping.

There's a lot packed into Tuesday, for some reason there are a lot of closeups on that day, including work on columns, curtain wall, some ductwork, knocking bits off the ceiling (which seems like not a great job), layout work, decking up top, and a little bit of time watching the tower crane cab area at high speed for fun.

Wednesday has duct shuffling and more curtain wall work.

Thursday has ceiling skim coat, more layout and more curtain wall. (On these lower floors we can't actually see the ceiling skim coat, but in later episodes, when they're working on higher floors, we will be able to see it.)

On Friday I was happy to be able to catch more of the elusive work on the stairs. That is difficult to catch because they only do it every once in a great while and I never know when, it is back in the dark, and a camera has to be pointed right there at just the right time. But I managed to get some of it. There's also some decking removal, and for the first time the building is all brightly lit up.

Saturday is all ceiling skim coat, and then on Saturday night we catch someone "resting" in the alley, and a very friendly fellow passing by.

No corny jokes this week, which could be a good thing or bad thing, depending on how you feel about those.

Chapters:

00:00 - Mon (framing, pipe and doorframe delivery)
06:28 - Tue (columns, forms, curtain wall, ducts, ceiling jabber, crane, layout, decking)
23:00 - Wed (duct shuffling, curtain wall)
29:49 - Thu (ceiling, layout, curtain wall)
35:48 - Fri (decking, stairs)
41:21 - Sat (ceiling, nighttime alley people)
48:46 - Closing and previews

Music licensed from Audio Network. In chronological order:

Monday:
Fender Bender — Chris Blackwell (2391/3)
Down The Front — Tom Peters, Lorenzo De Feo, Remy Mallett (2376/10)

Tuesday:
Destination — Marc Jackson Burrows, Hamish Michael Jackson (3426/1)
Mac Jazz — Gareth Johnson (1222/12)
Whenever We Ride 2 — William Davies, Dag Torgersbraten (3415/20)
Hot Foot — Terry Devine-King (1559/3)
Christopher Street Beat — Paul Michael Harris, Simon Bates, David Kelly (3294/1)
Tomorrow's Sun 2 — James Taylor (3328/95)

Wednesday:
Filtertron — Gareth Johnson (2916/4)
Just Reach For The Sky 2 — Julian Emery, Cenzo Townshend (3366/19)

Thursday:
Sail On Through 2 — Miriam Speyer, Lincoln Grounds, Thomm Jutz (3101/43)
I've Been Down This Road 3 — Michael Farkas, Teddy Weber, Seth Travins (3182/10)

Friday:
Head To Toe 2 — Craig Hardy, Carolyn Jordan, Alice Penrose (3317/17)
Psychedelic Space — Igor Dvorkin, Duncan Pittock (1141/1)

Saturday:
Wandering — Igor Dvorkin, Duncan Pittock (1143/4)
Blue Notes — Marc Jackson Burrows (3426/7)

Closing and previews:
Crack On — Chris Fairbrass, Richard Fairbrass, Neil Sidwell (2686/8)

As usual, you're always welcome to listen to your own playlist instead if you prefer (there's no dialog in the video).

This video is not endorsing or recommending, nor was it endorsed by, any business, product, or organization. The appearance of, or mention of, any person, business, product or organization in it is not necessarily an endorsement or recommendation of or by that person, business, product, or organization. This recording is of views and scenes visible to the public.

Видео One-week construction time-lapse with closeups: Week 34 of the Ⓢ-series канала Hospital Construction
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
1 ноября 2020 г. 5:31:19
00:50:17
Другие видео канала
Wheel loader moving dirt from point A to point B at 4x: Musical time-lapse (Weeks 33+34 set 1)Wheel loader moving dirt from point A to point B at 4x: Musical time-lapse (Weeks 33+34 set 1)Spreading gravel: Musical construction time-lapse (Weeks 33+34 set 2)Spreading gravel: Musical construction time-lapse (Weeks 33+34 set 2)2-week construction time-lapse w/closeups: Ⓗ Weeks 219+220: Lotsa bricks, traffic light move2-week construction time-lapse w/closeups: Ⓗ Weeks 219+220: Lotsa bricks, traffic light moveThe concrete pumping samba (Ⓗ Week 40 construction clips set #1)The concrete pumping samba (Ⓗ Week 40 construction clips set #1)One-week construction time-lapse w/over 38 closeups: Ⓗ Week 81: Ironworkers, concrete pours and moreOne-week construction time-lapse w/over 38 closeups: Ⓗ Week 81: Ironworkers, concrete pours and more5-week construction time-lapse: Ⓗ Weeks 189-193 (M.O.B. edition): Sunshades, last curtain wall5-week construction time-lapse: Ⓗ Weeks 189-193 (M.O.B. edition): Sunshades, last curtain wall1-week construction time-lapse w/over 30 closeups: Ⓗ Week 75: Ironworkers; cranes; welders; concrete1-week construction time-lapse w/over 30 closeups: Ⓗ Week 75: Ironworkers; cranes; welders; concrete91 trucks in 3 minutes - time-lapse (Ⓗ Weeks 5 to 8, construction clips set 2)91 trucks in 3 minutes - time-lapse (Ⓗ Weeks 5 to 8, construction clips set 2)Forklift and trucks doin' the limbo dance (Ⓗ Weeks 5 to 8, construction clips set 7)Forklift and trucks doin' the limbo dance (Ⓗ Weeks 5 to 8, construction clips set 7)Climbin' excavator (Ⓗ Week 36 construction clips set #3)Climbin' excavator (Ⓗ Week 36 construction clips set #3)An excavator flexing its unattached snout (Ⓗ Week 28, construction clips set 2)An excavator flexing its unattached snout (Ⓗ Week 28, construction clips set 2)Look out below! Gravel delivery disco musical time-lapse (Ⓗ Week 39 construction clips set #2)Look out below! Gravel delivery disco musical time-lapse (Ⓗ Week 39 construction clips set #2)Leftovers: Deleted/unused scenes from Ⓗ Week 59's construction time-lapseLeftovers: Deleted/unused scenes from Ⓗ Week 59's construction time-lapseConstruction time-lapse Ⓗ weeks 16 and 17: Excavation officially "bottoms out"Construction time-lapse Ⓗ weeks 16 and 17: Excavation officially "bottoms out"One-week construction time-lapse w/over 22 closeups: Ⓗ Week 74: Ironworkers; cranes; welders; moreOne-week construction time-lapse w/over 22 closeups: Ⓗ Week 74: Ironworkers; cranes; welders; moreGlass Curtain Wall Time-lapse Compilation / Musical (from Ⓗ Weeks 93, 94, and 95)Glass Curtain Wall Time-lapse Compilation / Musical (from Ⓗ Weeks 93, 94, and 95)2 hours of concrete pumping video compressed into 6½ minutes (Ⓗ Week 39 construction clips set #1)2 hours of concrete pumping video compressed into 6½ minutes (Ⓗ Week 39 construction clips set #1)Reversable excavator attachment (Ⓗ Weeks 5 to 8, construction clips set 1)Reversable excavator attachment (Ⓗ Weeks 5 to 8, construction clips set 1)Forty-six buckets of dirt at 10X (Ⓗ Week 36 construction clips set #4)Forty-six buckets of dirt at 10X (Ⓗ Week 36 construction clips set #4)Dirt in motion: Mellow musical montage of construction time-lapses (Ⓗ Weeks 12 to 14, set 1)Dirt in motion: Mellow musical montage of construction time-lapses (Ⓗ Weeks 12 to 14, set 1)Pumping concrete into big pits (Ⓗ Week 29, construction clips set 1)Pumping concrete into big pits (Ⓗ Week 29, construction clips set 1)
Яндекс.Метрика