Last layer of asphalt on the Sofia ring road (17.04.2021)
Drone video from the construction of the SOP (Sofia Ring Road) from the Trakia highway to the Mladost residential area
The beginning of the section is at km 35 + 180 at the already existing clover of SOP with the beginning of Trakia Motorway.
The end of the section under construction is at km 41 + 100, where the Mladost Nature Park is being built and which will be an overpass for the direct direction with a roundabout on the lower level.
Along the route are built 4 road junctions with overpasses for the transit of the upper and circular under them for all other connections.
The local lanes in the whole section are one-way and coincide with the direction of movement of the central lane. Along the length of the section, intertwining zones are also provided for connection between the central lane and the local lanes with a length of 120 meters each. The sidewalks are 2 meters wide and are tiled. Three pedestrian overpasses will be built at km 36 + 156.14, km 36 + 846.12, km 37 + 314.75.
Total length: 6.08 km
Design time: 180 days
Deadline: 730 days
Warranty periods:
- for construction and installation works without road facilities: 5 years
- for road facilities: 10 years
Construction supervision: SOP-SOUTH 2018 ASSOCIATION
Contract value: BGN 1,856,808 with VAT
You can see a 3D project of the entire route here:
https://www.youtube.com/watch?v=1g2pSxEgmjw
Video: SOP from zk. Youth to Trakia highway
Video Format: 4k
Date: 17.04.2021
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is a violation of the license under which this video is available on the YouTube platform
Видео Last layer of asphalt on the Sofia ring road (17.04.2021) канала skyPoint
The beginning of the section is at km 35 + 180 at the already existing clover of SOP with the beginning of Trakia Motorway.
The end of the section under construction is at km 41 + 100, where the Mladost Nature Park is being built and which will be an overpass for the direct direction with a roundabout on the lower level.
Along the route are built 4 road junctions with overpasses for the transit of the upper and circular under them for all other connections.
The local lanes in the whole section are one-way and coincide with the direction of movement of the central lane. Along the length of the section, intertwining zones are also provided for connection between the central lane and the local lanes with a length of 120 meters each. The sidewalks are 2 meters wide and are tiled. Three pedestrian overpasses will be built at km 36 + 156.14, km 36 + 846.12, km 37 + 314.75.
Total length: 6.08 km
Design time: 180 days
Deadline: 730 days
Warranty periods:
- for construction and installation works without road facilities: 5 years
- for road facilities: 10 years
Construction supervision: SOP-SOUTH 2018 ASSOCIATION
Contract value: BGN 1,856,808 with VAT
You can see a 3D project of the entire route here:
https://www.youtube.com/watch?v=1g2pSxEgmjw
Video: SOP from zk. Youth to Trakia highway
Video Format: 4k
Date: 17.04.2021
Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is a violation of the license under which this video is available on the YouTube platform
Видео Last layer of asphalt on the Sofia ring road (17.04.2021) канала skyPoint
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Construction of Europe highway (10.04.2021)НОВИЯТ Софийски ОКОЛОВРЪСТЕН ПЪТ | Младост - Тракия || The New Sofia RING ROADRoad reconstruction of Botevgrad - Vidin - Lot-1vbSky: Строителен обзор 2020 || София || Construction overview 2020 || Mavic MiniModern Road Construction Machines - Amazing Extreme Asphalt Paving Machine ▶ 106.03.2021 - АМ Струма при Симитли27.03.2021 - АМ "Хемус" от ПВ "Буховци" до ПВ "Белокопитово"13.05.2019 - Бул. "Васил Левски" във Варна21 години от подписването в Брюксел на протокол за изграждането на Дунав мост 2EVOLUTION of WORLD'S TALLEST BUILDING: Size Comparison (1901-2022)БЪДЕЩИЯТ БУЛЕВАРД Западна Тангента - Овча купел, София || A FUTURE RING BOULEVARD, SOFIAЗападна дъга на СОП от високо (участък 1) / Sofia Ring Road Construction by TraceConstruction Equipment Excavator Dump Trucks Bulldozer Working Building New Road(18.04.21) АМ Хемус напредък в строежа на всички мостове над река Вит от п.в Боаза до п.в. Дерманци25.04.2020 - Ремонт на бул. България в СофияConstruction Vidin - Vratsa highway in Bulgaria - Lot-1 (15.05.2021)Momma Bear Struggles with Cubs || ViralHogTHE NAIROBI EXPRESSWAYНапредва строителството на БОП (04.04.2021)СТРОЕЖ НА АМ "ЕВРОПА" - DRONE FLY OVER 08.04.2021 /LOT-1 Калотина-Драгоман