Загрузка страницы

Stormwater Management Project Profile » Rialto Fulfillment Center, Rialto, CA

A new distribution center complex was built in Rialto, California, to meet the growing demands of online shoppers. A total of 11,100 LF of 162” diameter, perforated CMP stormwater detention was used, providing 1,588,038 CF of storage in the pipe. An additional 1,368,742 CF of storage is provided from the stone backfill. The system was made with 26 runs, ranging from 75’ to 698’ connected via a 60” manifold. #GoBigWithContech
Learn more at https://www.conteches.com/stormwater-management/detention-and-infiltration/cmp-detention-and-infiltration
#stormwater #stormwatermanagement #civilengineering

Видео Stormwater Management Project Profile » Rialto Fulfillment Center, Rialto, CA канала Contech Engineered Solutions
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
6 августа 2020 г. 22:28:14
00:01:00
Яндекс.Метрика