Tesla Gigafactory Texas 24 March 2021 Cyber Truck & Model Y Factory Construction Update (07:45AM)

Gigafactory Texas on 24 March 2021! This is where the Cyber Truck and Model Y will be built!
Although it was a bit muddy, crews were still busy making progress at Giga Texas! Great flying weather and the clouds helped with the lighting this early morning, so the imagery in the video came out well.
In this video, we also look at the known basic layout of the main factory and the areas around it, and we look at some unknown areas as well where significant construction or land preparation is taking place as well. Also, we look at an updated timeline for both products and the construction of the site.

Timestamps:
Basic layout and timeline update and illustrations: 0:27 to 4:07
Drone flight footage & infographics: 4:12 to 28:18

Here are some highlights from an incredibly busy day:
- The battery cell area large excavation pits are getting large footings for columns installed on top of large parallel foundations already poured. You can also see in-between these large foundations even more reinforced cementitious piers just sticking above the level ground.
- The west structure is getting a number of interesting additions, including what looks like a large ramp on the northwest corner, a work elevator cage and installed mechanism also on the northwest corner, more concrete 2nd floor pouring, a duplicate accessibility ramp started about 500 feet south of the one they just constructed on the west side, and more steel installation on the east side.
- The red cranes have been relocated further south and more steel parts are being stockpiled in this southwest corner area. Also, new footing work has begun in this area, working a further south of the line of footings that were completed about a month ago. This looks to possibly be the push to complete all footings in this area of the foundation.
- The Body-in-White structure on the east side is getting another large section of the second floor poured with concrete. Interestingly, on the north side of this structure near where it meets the paint shop, they are moving in robotic assembly machines (covered in aluminum foil-type wrapping) into this structure.
- The stamping machine structure has a lot of material stored on the roof, most likely the next layer of materials that will be installed. Also, the column extensions are now all installed and more wall panels are being installed on the south side.
- The casting machine structure bridge roof columns and beams to the paint shop steel roof is nearly complete and this area joined the current length of the concrete structure.
- The paint shop modular production lines on the second floor are progressing quickly, as are what looks to be large tanks on the ground floor (in the vaulted ceiling area, seen from the south side).
- The storm water pipe manufacturing is churning out a large quantity of pipes and these are being installed and then re-buried almost as quickly.
-- On the far east side, more parts and equipment storage is noted where the contractor trailers used to be. Some of this equipment seems to be related to powder coating machinery that was delivered recently.
- The switchyard and associated conduit trenching, and vault installation is moving along very quickly, despite recent rains that have created large mud spots and some trenched filled with water.

Thank you for watching and I hope this has been informative, educational and entertaining for you. If you would like, please consider supporting me via Patreon (link is in the description of this video and in the video itself) so I can continue to make and share these incredible videos.

Follow me on
Patreon https://www.patreon.com/joeslastchancegarage
Twitter @JoeTegtmeyer
Instagram (Joe’s Last Chance Garage) for the latest updates: #joeslastchancegarage
Facebook Joe Tegtmeyer and Joe’s Last Chance Garage

Use my Tesla Referral code https://www.tesla.com/referral/joe66892

Be sure to check out additional Texas Gigafactory footage on these channels:
@Jeff Roberts
@Terafactory Texas
@Texas Terafactory

Video, photos, illustrations and commentary on this video is by me, Joe Tegtmeyer unless otherwise annotated.

Music in this video is obtained from the YouTube free and unrestricted and royalty-free use library.

Drones used are DJI Mavic Mini and Mavic Air 2.

Drone flight over Giga Texas is with permission of Tesla and CEO Elon Musk

Видео Tesla Gigafactory Texas 24 March 2021 Cyber Truck & Model Y Factory Construction Update (07:45AM) канала Joe Tegtmeyer
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
25 марта 2021 г. 3:46:46
00:28:19
Яндекс.Метрика